![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2256117/small_1663682944-avatar-jeffc526.jpg?twic=v1/output=image&v=2)
10 August 2022 | 5 replies
Why would you bring an engineer to a showing appointment?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2521004/small_1696063367-avatar-dustinm216.jpg?twic=v1/output=image&v=2)
16 August 2022 | 3 replies
There will be soft costs of architects, engineers, etc and of course you will need to cover the debt while there is no incoming revenue.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/836840/small_1695108099-avatar-kristinaj4.jpg?twic=v1/output=image&v=2)
15 August 2022 | 7 replies
The time it takes a builder to work with a structures framing and CMU basement that are not plumb, square, true, flat or waterproof is more costly than rebuilding with current building codes and engineering.2) Take the time and cost you think it will be and multiply by 3 and 1.53) contractors will fail you again and again.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/928554/small_1688656530-avatar-dustinblackmon.jpg?twic=v1/output=image&v=2)
16 August 2022 | 3 replies
Also ask if they consider importing fill of that depth/volume to be 'grading' which could require a separate permit and a geotechnical engineer oversee the backfill to ensure that it is properly compacted.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2522109/small_1695588337-avatar-jb1951.jpg?twic=v1/output=image&v=2)
22 August 2022 | 40 replies
We had to get engineering set for door design, procure lumber via specialty suppliers, then engineer how lift would work.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1528466/small_1660689359-avatar-dank193.jpg?twic=v1/output=image&v=2)
18 August 2022 | 5 replies
Usually SFH are too small for engineered studies - I do algorithm based ones.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/232725/small_1621434993-avatar-jerrypoon.jpg?twic=v1/output=image&v=2)
17 August 2022 | 7 replies
I am worried that the insurance will just drag this out, demanding more $1k letters, possibly engineering studies, etc.Any suggestions on what I should do?
18 August 2022 | 1 reply
You'll need meetings with the city, GC, architect, engineering, lawyer (for liability) at a minimum.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1706221/small_1695877857-avatar-sharewood82.jpg?twic=v1/output=image&v=2)
21 August 2022 | 8 replies
It’s actually in a really nice neighborhood and I would’ve been open to building a home on the property, but not at the expense of having to hire a civil engineer and all the other minutia I would have to go through.
19 August 2022 | 4 replies
We provide assistance with EV charging planning, site design, software/equipment selection, engineering/permitting, full in-house installation, and maintenance for EV charging.