Dawn Quinn
Reia Associations in ATL area - need recommendations
20 February 2018 | 3 replies
@Dawn Quinn I would suggest GAREIA, lots of experienced investors.
Loretta Davis
Arkansas Handyman (Little Rock)
23 February 2018 | 2 replies
Immediate need is to fix a dishwasher (it was just installed incorrectly), install a new vent hood in the kitchen and check air vent in one of the bedrooms.
Sarah P
What Should be On Your MLS?
2 July 2012 | 0 replies
How about Features such as dishwasher or energy efficenet appliances?
Andrew P.
Advise needed on purchasing my 2nd invest prop w/an FHA loan
23 March 2016 | 4 replies
I had to do zero renovations other than change out the gasket on the dishwasher.
Joshua Lyon
Has anyone heard of NCST First Look program?
15 December 2016 | 4 replies
I've been trying to find it.Thanks,Dawn
Tamar Firouz
Looking for a contractor in Detroit Michigan
31 January 2018 | 8 replies
Moisture resistant drywall will be used in all wet locationsAll ceramic tile will be installed on 1/2" cement board or a concrete PaintNew Switches, Receptacles, GFCIs and cover plates to codeHardwired smoke detectorsCarbon Monoxide DetectorsBathroom: Install Ceramic tile on walls for tub and floorInstall new pre-hung 6 panel hollow core doorNew Toilet with ring and supplyNew Vanity with faucet, drain and supply linesInstall new light fixtureInstall bath exhaust fanNew medicine cabinetInstall New TubBathroom Accessories (Toilet paper holder, towel bars, etc.)Bedrooms / Living room:Install new pre-hung doorInstall all trim ( Door Casing, Base, Shoe)Install Flooring material (Carpet, Hardwood,Laminate )Install New Light fixtureInstall Closet door (Type to be decided)Kitchen: Install Ceramic floorInstall New kitchen cabinetsInstall Counter top (Granite/Corian/Laminate)Install New Undermount sink and faucet Install Ceramic backsplash with accentInstall Light fixturesInstall garbage disposal (if applicable)Install Dishwasher (If applicable)Install all trimInstall pre-hung pantry door (If applicable)All material types will be selected by you and installed by us.
Geoffrey Serdar
Our first duplex acquisition - Minneapolis
8 April 2016 | 11 replies
Updating projects include:2 x new kitchens2 new sets of appliances including plumbing for dishwashers (didn't have dishwashers)Building out washer/dryer laundry rooms off the kitchen, so tenants will have separate systemsAll basement windows will be replaced with glass block that can open (for venting)I'm tearing out all the gross drywall and crap in basement and starting freshUpdating bathroomsInstalling Glass Block in the bathroom windowsFixing a few windowsPaint the whole damn thing inside and outRipping off (and capping) the unused crumbling chimneyWater managementGutters installed with drain pipes so I get the water away from the perimeterRipping out the carpet and refinishing the original hardwood - everywhere (if it's salvable)I am rebuilding a stairway making it saferA few other projectsTotal price after all Rehab/Fees is approximately $210,000I don't know what my rentals will be, I am going to begin marketing it @ $1,500.00/unit I believe I will be able to lease there, or at the lowest $1,300.00/unit (as is market values on craigslist and other sources)The neighborhood is considered the good part of the rough area, lower owner-occupant, lot's of section 8 in surrounding areas.
Justin Goodin
Renovation Cost Breakdown
4 January 2024 | 9 replies
I spent $16,444 renovating this 3-bedroom apartment at one of my properties.Here's the breakdown:- Kitchen faucet: $76- Thermostat: $30- Bathroom hardware: $34- Toilet: $94- SS stove: $250- SS microwave: $150- SS fridge: $781- SS dishwasher: $349- 6 MIL LVP flooring: $2,840- 4 black matte LED ceiling fans: $204- Bathroom faucet: $77- Bathroom vanity: $189- Bathroom mirror: $60- Lighting fixtures: $150- White shaker cabinets: $2,142- Black matte cabinet handles: $36- Blinds: $88- Black matte hinges: $51- Black matte door knobs: $108- Blanco single bowl sink: $100- Blanco sink rack: $25- Quartz countertop & install: $1,100- Smart lock: $40- Paint & materials: $565- Random materials/parts: $259- Labor: $6,646Renovation time: 30 daysPrevious rent: $575Signed leased: $1,610Long term hold strategy.I'm choosing to renovate every unit to a premium level finish with high quality materials.
Dawn Heimann
Series LLC or Just LLC's? / Local CPA who invests in RE?
10 April 2021 | 25 replies
@Dawn Heimann I own a 20 unit in South Bend, Indiana, and I hold it in an LLC in Indiana even though I live in the Chicago area.