
14 February 2025 | 161 replies
The sidewalks were destroyed and the walk way concrete was off set.

17 December 2024 | 19 replies
Things that have stood out so far in my research: 1-Close proximity to Metro North (90 minute ride to NYC)2-Vassar Medical Center3-Marist & Vassar Colleges 4- The Walkway over the Hudson5-Restaurants/Cafes/Hotels, etc.Thanks for your time.

15 December 2024 | 2 replies
Also, can I stipulate in the lease that the tenant has to maintain the lawn and shovel the driveway and walkways, or am I required to pay a vendor?

4 December 2024 | 18 replies
Who is responsible for cleaning the construction site and keeping public walk ways free and clear of construction debris since you are in CA without the ability to monitor the site?

25 November 2024 | 8 replies
I would also call pest companies in your market to see what the schedule looks like.Snow removal is on the landlord, and icing the walkways.

23 November 2024 | 1 reply
Completely renovated main level:* Demoed and redid kitchen with new appliances* Refinished floors and reglazed bathroom* Replaced the roofComplete demoed and finished the basement and landscaping* Replaced half bath with full and added 2 bedrooms* Replaced entire plumbing including sewer line* Added second washer dryer* installed stamped concrete patio and walkway plus fence* All new landscapingWhat was the outcome?

15 November 2024 | 7 replies
While it is legally a fourplex on a single lot, there are technically two buildings, a two story duplex and a side by side duplex with a walkway between them.

31 October 2024 | 4 replies
Client Name: Property Adddress: Current Property Type: Post Rehab Property Type: Level of Finishes: List Structural Changes: Final Bed/Bath Count: Exit Strategy (sell or refinance): PHASE 1: PRE-CONSTRUCTION Original Amount Net Adjustments Adjusted Total Description Drawings $ - $ - $ - Permits $ - $ - $ - Expeditor $ - $ - $ - Alarm/Security $ - $ - $ - Temporary Fencing $ - $ - $ - Portable Toilets $ - $ - $ - Engineering Fees $ - $ - $ - Architectural Fees $ - $ - $ - Utilities $ - $ - $ - TOTAL PRE-CONSTRUCTION $ - $ - $ - PHASE 2: DEMOLITION Original Amount Net Adjustments Adjusted Total Description Interior Demo Exterior Demo Dumpsters TOTAL DEMOLITION $ - $ - $ - PHASE 3: CORE AND SHELL Original Amount Net Adjustments Adjusted Total Description Excavation $ - $ - $ - Foundation $ - $ - $ - Underground Plumbing $ - $ - $ - Drain Tile $ - $ - $ - Sump Pump $ - $ - $ - Steel $ - $ - $ - Floor Joists $ - $ - $ - Subfloor $ - $ - $ - Rough Carpentry $ - $ - $ - Interior Stairs $ - $ - $ - Dormer $ - $ - $ - Roof Masonry Siding Windows Exterior Paint Soffit/Fascia Gutters Landscaping Walkways Exterior Doors $ - $ - $ - Exterior Stairs $ - $ - $ - Porch $ - $ - $ - Deck $ - $ - $ - Driveway $ - $ - $ - Garage TOTAL CORE AND SHELL $ - $ - $ - PHASE 4: HVAC Original Amount Net Adjustments Adjusted Total Description HVAC Rough Furnace Condensing Unit & Lineset $ - $ - $ - HVAC Trim $ - $ - $ - TOTAL HVAC $ - $ - $ - PHASE 5: ELECTRICAL Original Amount Net Adjustments Adjusted Total Description Electrical Rough $ - $ - $ - Electrical Finish & Fixtures Low Voltage TOTAL ELECTRICAL $ - $ - $ - PHASE 6: PLUMBING Original Amount Net Adjustments Adjusted Total Description Water Service Upgrade $ - $ - $ - Sewer $ - $ - $ - Plumbing Rough $ - $ - $ - Water Heater $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - TOTAL PLUMBING $ - $ - $ - PHASE 7: DRYWALL AND DOORS Original Amount Net Adjustments Adjusted Total Description Insulation $ - $ - $ - Drywall, Tape, Sand $ - $ - $ - Finish Carpentry (Trim) $ - $ - $ - Interior Doors $ - $ - $ - Interior Paint $ - $ - $ - TOTAL DRYWALL $ - $ - $ - PHASE 8: FLOORS Original Amount Net Adjustments Adjusted Total Description Hardwood Floors $ - $ - $ - Tile Vinyl Carpet $ - $ - $ - TOTAL FLOORS $ - $ - $ - PHASE 9: KITCHEN Original Amount Net Adjustments Adjusted Total Description Cabinets Countertops Backsplash Plumbing Fixtures $ - $ - $ - Light Fixtures Appliances TOTAL KITCHEN $ - $ - $ - PHASE 10: BATHROOMS Original Amount Net Adjustments Adjusted Total Description BATHROOM # 1 Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 1 $ - $ - $ - BATHROOM # 2 Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 2 $ - $ - $ - BATHROOM # 3 - Basement Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower $ - $ - $ - Tile $ - $ - $ - Vanity $ - $ - $ - Countertop $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 3 $ - $ - $ - **Please add itemization of work for additional kitchens or bathrooms** PHASE 11: OPTIONAL Original Amount Net Adjustments Adjusted Total Description Other $ - $ - $ - Fireplace $ - $ - $ - Final Cleaning Staging Stucco Closets General Contractor Fee $ - $ - $ - Finish Carpentry $ - $ - $ - Underpinning $ - $ - $ - Footers $ - $ - $ - Contingency $ - $ - $ - TOTAL OPTIONAL $ - $ - $ - Total Estimated Cost of Repairs $ - $ - $ -

28 September 2024 | 12 replies
Along with the monthly HOA's, there is always the risk of assessments and these aren't always emergency repairs like cracked walkways, broken elevators etc.

14 September 2024 | 12 replies
On the left hand side of the house, can you make a walkway over the back roof and have steps that come down the back and wrap the corner onto the 2nd floor egress?