Venus Rai
Tenants moved out and water main damaged
18 December 2019 | 5 replies
I have seen this many times for water and electricity.
Ronald Starusnak
How To Evict Old Ladies?
1 June 2022 | 92 replies
We doubled the rents, but upgraded the furnace (it needed it), HW tank from electric to NG & gave them a scratch & dent stove, washer & dryer that we keep in stock.
Od Ntuk
Gut Rehab Estimates in Philadelphia / Philly
19 December 2019 | 8 replies
Here is a standard for 900-1200 sqft row homes in Philly depending on the neighborhood and assuming nothing is wrong with the foundation:South Philly/West Philly West of 52nd Street: 75-85k (contingent upon underpinning basement which is big expense)-Complete gut, redo electric and plumbing, dig the basement, redo everything, Central AC, turn a 3/1 into a 3/2 or 2/2 w/ a master suite higher-end finishes, touch facade.Germantown Close to Germantown Ave/ Cobbs Creek/ West Oak Lane Close to Cheltenham / Better pockets of Olney: 60-70k-same as above but you do not necessarily have to underpin the basement.
Mike Hege
New Construction Multi-family in NC
6 January 2020 | 12 replies
Also new construction is way more energy efficient nowadays which saves the tenants money on utilities which is a huge bd Elliot point.It really boils down to the numbers and available inventory.
Caryn Zallnick
Does anyone have experience with corporate housing?
2 January 2020 | 10 replies
Windows, doors, all new hardwood flooring, (most of it in a herringbone design), new roof, new siding & all the electrical & plumbing was completely updated.
Michael Bonanno
Turnkey Property for First Investment
10 December 2019 | 28 replies
You have traded a LOT of time and energy and risk for a higher potential reward.The turnkey option means that you don’t need to do any of the work I mentioned above, this doesn't mean that you won't also have to do your due diligence.
Account Closed
Cost Segregation + Bonus Depreciation
1 July 2020 | 25 replies
A cost segregation is something done by a qualifying firm/ expert where they separate out components of the building that may have shorter lives Say they do their thing, separate a value for electrical, HVAC ect- and they say $250k of this is all components with 7 years lifes.
Cody Evans
Wholesaling For Newbies: How To Estimate Repair Costs
9 November 2017 | 7 replies
Just to try and get an ESTIMATE to make an electric outlet for my stove the other day the electricians wanted $100-$150.
Michelle Moss
Water bill charges in Duplex Cleveland Ohio
29 November 2016 | 9 replies
Today I received a text from one of my tenants stating I should look at section 375.05 of the Cleveland code regarding utilities, specifically the water as the gas and electric is separately metered at the property.
Edward Yoo
New Construction - 36 Unit Apartment Complex
10 October 2020 | 12 replies
Here are general details:-1st floor needs to accommodate approximate 55 parking stall for the 36 units-Parking will take up around 20,000sf of space-The remaining square footage of about 4,000sf can house elevator lobby, stairs, trash, electrical transform, commercial space etc.-36 allowed units at 850sf average size require about 30,000sf of building. adding the circulation and non-residential square footage pushes this number up to a total building of about 40,000sf.