25 May 2021 | 7 replies
Uniform-density blocks are easy to transport to a worksite, and are pre-cured, saving drying time compared to hand-cast “in situ” or spray applied hempcrete construction.

4 April 2009 | 9 replies
Throw up some dry wall right over the paneling4.

8 August 2020 | 9 replies
., what are the lot setbacks, what is the soil, does the lot receive drainage?

18 August 2017 | 15 replies
Here are the expenses on this one: apartment Vendor Project description Date Amounts Notes house sears 3 stoves/2 refridgerators 5/25/2017 $ 2,111.18 1 right Doug bathroom floor 4/11/2017 $ 500.00 replace floors 2 left David bathroom floors/repair 4/23/2017 $ 400.00 2r/2w Doug bathrooms 4/14/2017 $ 755.00 replace floors 1 right mikes carpet carpet two bedrooms 3/3/2017 $ 532.00 2r/2l amber clean up 5/5/2017 $ 80.00 1r/2r sears cook stoves 4/23/2017 $ 837.41 All Joey dry wall aropund windows 3/27/2017 $ 1,950.00 2 right jesse drywall bedroom wall 4/15/2017 $ 150.00 house Brian Elec elec work 3/24/2017 $ 4,503.00 house Kevin electrian 4/30/2017 $ 100.00 wires 2r/2l Danny floors 5/5/2017 $ 1,000.00 replace with floating floors house libert ut gas bill 6/6/2017 $ 216.44 house David hook up gas stoves 6/1/2017 $ 60.00 house honor captal insurance 2/29/17 $ 209.00 house honor captal insurance 3/19/2017 $ 209.00 house honor captal insurance 4/17/2017 $ 209.00 house honor captal insurance 5/17/2017 $ 209.00 1 right Doug kitchen drywall 4/18/2017 $ 200.00 house Doug labor 6/5/2017 $ 2,200.00 finsh all reoairs and hang doors house jesse locks and light 4/30/2017 $ 150.00 houise walmart mailboxes 5/10/2017 $ 48.88 3 mailboxes remodler outlet materials 2/14/2017 $ 722.50 1 west remodler outlet materials 2/27/2017 $ 134.64 1 west remodler outlet materials 3/27/2017 $ 1,006.91 2 right home depot materials 4/23/2017 $ 280.29 for floor 2r/2l home depot materials 5/5/2017 $ 1,226.08 floors and supplies house home depot materials 5/9/2017 $ 75.52 plug covers/thermostats/mailbox materials 5/23/2017 $ 148.93 for 3rd floor door house home depot materials 5/26/2017 $ 878.22 doors baseboars house home depot materials 5/29/2017 $ 250.37 1 left home depot materials 6/1/2017 $ 247.36 toilt/miscellaneous 1 left jesse miscellaneous 6/19/2017 $ 160.00 house James paint 4/30/2017 $ 1,050.00 house Branco gardner payment $ 1,353.30 house Moniz plumbing 3/27/2017 $ 2,035.07 house mike plumbing 4/11/2017 $ 625.00 hallway put up 3rd floor door 5/23/2017 $ 350.00 to block off attic 1 east Poters repair and prep for paint 3/10/2017 $ 900.00 house Joey roof/siding $ 22,222.00 house smoke isp $ 264.85 1 right Doug tubs/toilt 5/1/2017 $ 135.00 house Joey windows 1/25/2017 $ 4,651.02 house home depot 2/14/2017 $ 1,458.63 lowels 2/14/2017 $ 1,500.85 house u hal 5/26/2017 $ 48.72 to pick up all supplies 1 east home depot materials 6/2/2017 $ 56.78 house ABC dumpster 6/5/2017 $ 587.34 1 east danny floors/ matrial 6/7/2017 $ 1,117.24 railings, 3 floors basement derick clean up all waste 6/7/2017 $ 200.00 1 left jesse last small repairs 6/20/2017 $ 160.00 house ABC dumpster extra feesa 6/16/2017 $ 119.00 1 left amber clean up 4/21/2017 $ 100.00 2 left kevin elec work 5/21/2017 $ 150.00 house home depot light covers/fau 6/3/2017 $ 41.95 1 east national grid elec bill 6/28/2017 $ 68.85 1 west national grid elec 6/28/2017 $ 118.87 house liberty utilies gas bill 5/16/2017 $ 216.44 house national grid elec 4/26/2017 $ 4.54 house city of Faa River taxes 6/29/2017 $ 654.10 house honor captal insurance 6/17/2017 $ 209.00 $ 62,159.28

6 January 2017 | 15 replies
If you are apply a product w a sheen, the light should reflect evenly even after paint has dried.

27 March 2017 | 3 replies
I had a guy from bone dry roofing do my personal home and i had him price out a couple roofs on rentals i was looking to purchase.

13 April 2014 | 10 replies
Likely buyers are foreign investors that will buy at lower caps and also people who have built up SFR portfolio's but those are dried up in many markets.

16 December 2022 | 34 replies
Oh yeah, love all the info about contracts, dry, but I also love that stuff because it's important!

26 March 2021 | 6 replies
I loved working for Universal, but the appetite for new attractions has dried up since COVID and without new attractions, there is no need for the designers who design them.

29 February 2020 | 6 replies
Checking with the departments one by one for each land listing that looks promising seems very inefficient.Regarding costs, i hear build costs of containers vs stick built being similar, but I had wondered if that is taking all aspects into consideration like build time, foundation and site prep requirements, etc. yes, steel cutters and welders are a special trade but the structure can arrive pre-built and potentially just sit on concrete pier foundations if the soil and zoning allows.