
12 September 2021 | 0 replies
However, because of the spectacular views I could get from this second floor I am still trying to figure out best way to put second story ADU.Has anyone added second story on top of the existing house?

13 September 2021 | 4 replies
We've put in a ton of sweat equity with refinishing the floors, replacing windows, upgrading electrical, and just general remodel.
13 September 2021 | 0 replies
(Flooring, Paint, New Bath Tub etc..)

15 September 2021 | 4 replies
Our plan is to remove two non-load bearing walls to open up the main floor’s floor plan, gut and refinish the kitchen completely prior to moving in December 1st.

2 December 2021 | 8 replies
I'm going in October to refurbish with new flooring, paint and maybe some new kitchen countertops so I'm hoping that should conservatively put me at $200k in home value.

21 September 2021 | 44 replies
Inspect the flooring, doors, sliders, back yard and if all clear delete the $50 for next month.

13 September 2021 | 2 replies
Good Day,We are investors doing flipping n rental and are looking for proposals for licensed and insured contractors in the area of Clearwater, FL .We prefer to work in tradesmen and handymen instead of general contractors.The tradesmen we need are the following:o Drywall installerso General Handymano Painterso Floor installerso Kitchen▪ Kitchen remodeling company (they do it all)▪ kitchen installers (we source the materials they install)▪ Granite/Quartz installer (we source the materials they install)o Landscapero Plumbero Electrician● Pool -o Resurface steps since probably not replaceable-will find right subo Clean up the bottomo Filter housing & pump replacementIf you are interested please let us know your proposal and if have any contractors referrals that would be great¡¡Thanks in Advance,Have a great day

14 September 2021 | 2 replies
The rehab consisted of replacing the roof, changing the floor, doing a new kitchen, updating bathroom vanities, and painting the entire house.

15 September 2021 | 3 replies
An area of concern is the front concrete steps.

13 September 2021 | 0 replies
The rehab consisted of replacing the roof, changing the floor, doing a new kitchen, updating bathroom vanities, and painting the entire house.