
21 September 2020 | 1 reply
Rehab includes: bathroom demo and rebuild, flooring, paint, and appliances.

21 September 2020 | 1 reply
Scope of work includes:• Excavation of dirt crawl space in basement (roughly 350 sqft)• Foundation reinforce• New/level flooring• Rough in Framing/drywallWould anyone be willing to share names of general contractors in the area?

23 September 2020 | 6 replies
The other part, with the steel beams, is resting on cinderblock piers, which are resting on poured concrete piers.

21 September 2020 | 0 replies
I have a retail/office space that is the first floor of aMulti use facility I own.

21 September 2020 | 0 replies
If the floor falls in or the ceiling falls on him and injures him would I be liable for unsafe living conditions?

23 September 2020 | 12 replies
I do this, and recommend you do going forward, is take a video walkthrough of the house between tenants including inside and outside of dishwashers, all appliances, floors rooms walls everything etc.

13 October 2020 | 7 replies
Also, I'd always include a few thousand for paint and flooring.

22 September 2020 | 0 replies
I am doing a flip that has a 480 square foot room off the kitchen, 4 windows, double exit door, sub floor, dry walled, heating vents, electrical outlets.

6 March 2021 | 11 replies
The biggest rehab projects were redoing the flooring (with sound barrier underlayment) on the whole house, upgrading the addition on the upstairs to match the quality of the rest of the house, hanging drywall & sound board on the ceiling of the basement and upgrading the basement kitchen/bathroom.

23 September 2020 | 2 replies
The first floor is rented out to a tenant and the second floor is vacant.