![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/329845/small_1674401826-avatar-7einvestments.jpg?twic=v1/output=image&v=2)
13 January 2025 | 15 replies
Tricky to set up though.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2905376/small_1705675401-avatar-sinou.jpg?twic=v1/output=image&v=2)
21 January 2025 | 5 replies
-Structural (foundation, wall, ceiling and floor)-Roof and Exterior(Roof Condition,Gutters and Downspouts, Siding, Windows and Doors)-Plumbing (Water Pressure,Leaks, Drainage, Pipes)-Electrical (Wiring,Outlets and Switches,Breaker Panel, Lighting Fixtures)-HVAC(Air Ducts, heating and cooling)-Water and Moisture Issues(Attic, Mold and Mildew)-Kitchen and Appliances-Bathrooms-Pest and Insect Problems-Safety Features
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2868465/small_1698941427-avatar-philp92.jpg?twic=v1/output=image&v=2)
1 February 2025 | 6 replies
So, I will set it up that way; he suggested this, because if there are disputes between me and the tenant, then they are more easily resolvable if the entity is in TN.Great news, if there is anything I can help with here in Memphis please reach out anytime.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3170141/small_1737691118-avatar-zoeb28.jpg?twic=v1/output=image&v=2)
6 February 2025 | 16 replies
Because they will get defensive if they feel you are pressuring them.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2289404/small_1737890216-avatar-cosmod.jpg?twic=v1/output=image&v=2)
27 January 2025 | 10 replies
You can set up a Wyoming LLC yourself.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2301154/small_1668834732-avatar-loganr91.jpg?twic=v1/output=image&v=2)
23 January 2025 | 5 replies
Paint rags and paint plastic $386.66 Initial 70% deposit Cabinets $13,029.02 Backer board, Fiber rock, Shower drains, Zinc backer board screws $385.71 Junk Removal $600.00 red gard ($123.10) Initial 50% deposit Windows $10,493.20 2x4 studs $52.33 Junk Removal $400.00 Flooring sample $6.01 Flooring sample $68.48 Flooring sample $62.62 Flooring sample $132.09 Paint samples for accent wall $38.34 10% Draw for Master bathroom demo $580.00 Wall and shower Tile+Grout-Guest bath $528.62 LVP Flooring $7,165.27 Demo Work $1,275.00 LVP Flooring $7,198.07 Floor tile-Guest bath $889.05 50% down for moisture barrier and animal extraction $2,541.30 Returning flooring samples ($263.19) Paint-2 5gallon buckets SW $382.38 Unsure on what these are $19.54 Unsure on what these are $48.00 Master shower floor tile $331.42 Paint $3,100.00 Flooring underlayment $888.42 Primer $178.71 Paint-5 1gallon buckets SW $180.26 Paint $3,100.00 Appliances $6,820.59 Master bath tub $986.76 Paint-1 5gallon buckets SW $194.81 Primer $268.54 Framing repair for rotted wood $1,000.00 Junk Removal $500.00 Floor tile-Guest bath $771.07 Floor and Shower wall tile-Master $4,559.43 Stair noses $334.20 Master shower floor tile $612.76 Farmhouse sink $385.91 Master ceiling paint $254.29 Drywall repair in kitchen ceiling $500.00 Childrens wall tile and floor tile $3,477.40 Master shower floor tile-Return ($331.43) Drop in sinks for children's bathroom $103.75 Drop in sinks for upstairs bathroom $51.87 Master sinks $147.64 Master floor tile $270.05 Electricity $169.70 16x cement backer board return ($139.60) Tub and shower faucets $414.96 4 x Toilet seats $788.22 Tile install materials for all bathrooms $863.00 Air filters $10.90 Gas pipe and AC tune up+Duct repair $1,216.00 Tile install materials for all bathrooms $984.78 Roll of insulation X2 $38.48 Primer refund $125.33 Shower faucets X2 $480.71 Water $11.41 Master shower floor tile-Return the original white one ($261.55) Demo and materials he bought $1,005.14 Pickup charge for picking up flooring $223.96 Flooring 1st payment $4,000.00 Flooring return-guest bathroom tile ($889.05) Red guard refund $71.34 Backer board, wall tile and floor tile upstairs master return ($134.34) Keys X3 $10.93 Remaining balance for moisture barrier $2,046.30 Subfloor repair $100.00 Flooring $9,900.64 Master tub filler faucet $311.35 Tile labor in all bathrooms $9,202.22 Stair treads and risers $1,160.76 Bathroom painting $2,000.00 Junk Removal $150.00 Return for stair noses ($334.20) Return for flooring ($13,488.73) Flooring $1,900.00 Flooring underlayment $899.35 Trim $1,053.17 Toilet supply lines $13.46 Tile sealer, garage epoxy, garbage disposal $313.00 Return for remaining balance ($1,098.57) Floor reducer $49.99 Garage door opener $267.66 Door hardware (Hinges and door handles) $451.14 Counter tops $5,287.01 Tile return ($981.43) Tile return ($685.14) Tile return ($385.53) Tile return ($153.19) Tile return ($613.13) Flooring $1,900.00 Plumbing and electrical work (Light fix, toilets, drains) $975.00 Light fixtures and faucets $975.49 Junk Removal $125.00 Baseboards $241.45 Switches, outlets, faceplates $234.53 Cabinet balance $5,583.86 Sink return ($155.62) Dining room light and 4 ceiling fans $923.70 Anti skid additive for garage floor $11.38 Flooring $1,900.00 Glidden gel paint $24.01 Paint refund ($1,046.40) Counter tops $2,304.23 Extension rods for ceiling fans $40.64 3 Ceiling fans (one was returned) $573.93 Return grills $100.11 Kitchen and nook light fixtures $283.80 Rod for curtains and toilet paper holder $84.10 Curtain rods $54.60 Garage door deposit $1,185.00 Cleaning $400.00 Water heater $756.18 Thermostat $181.41 Stump Removal $300.00 Dryer cord $28.53 Plumbing and electrical work (Light fix, toilets, drains) $3,525.00 Junk Removal $125.00 Grass seed $71.40 Return of shipping cost ($297.45) Duct cleaning $970.00 Drains for master $46.54 Sold Fridge ($200.00) Bathroom fans $91.92 Samples for brick $29.98 Peg board hooks $20.83 Wall plate covers $21.28 Steel pegboards $140.72 Return stair tread and Riser ($198.14) Pressure washing $1,216.00 Wall plate covers $8.11 Shower door for upstairs $729.83 Powder room counter top $702.99 Light bulbs $59.24 Shower door deposit $1,000.00 Staple gun, staples, supply lines $157.04 Bathtowel hanging hardware $130.89 Light bulbs $29.62 GFCIs, underlayment, downrods ($233.54) Sanding pads $59.10 Yard hanging tools $21.94 Supply line return ($13.12) Stair clips and balusters $779.58 Returned some bathroom tile ($109.05) Peg board hooks $120.04 Front door $3,235.01 Brick sealer $50.81 Bathroom fan light and peg board hooks $71.27 Sanding pads, sanding sheets, etc $38.48 Mirrors $65.84 Mirrors $291.88 Spray bottle for marble sealer $4.34 Brick backsplash $695.54 Sanding pads $2.20 Shelves and shelf brackets for storage room $73.14 Shower door balance $1,000.00 Mirrors $104.26 Returned mirrors ($89.50) Gutters $2,043.15 Floors for finishing room $373.78 Wall plate covers $8.07 Floetrel and hood vent $31.49 Plumbing and electrical work $175.00 Backsplash and fireplace $2,450.00 Trim paint $50.21 Tile for master finish $15.17 Returned something.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2841921/small_1695309538-avatar-ashleyk152.jpg?twic=v1/output=image&v=2)
3 February 2025 | 5 replies
Hey @Ashley Kroft I love using Pricelabs feature of creating a comp set because you can really drill down to the finer details of what others are doing in the market, in your specific area.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2734220/small_1692296394-avatar-jesses368.jpg?twic=v1/output=image&v=2)
5 February 2025 | 4 replies
Quote from @Jesse Scheidel: When setting aside money for Capex, Vacancies and maintenance, should you use multiple bank accounts?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2347974/small_1707511326-avatar-miker564.jpg?twic=v1/output=image&v=2)
5 February 2025 | 5 replies
Or should we sign the contract now and set the execution date for two weeks later?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3083651/small_1721792848-avatar-natashar60.jpg?twic=v1/output=image&v=2)
29 January 2025 | 3 replies
Quote from @Pamela Rivas: Hi Natasha,Here are some key points to consider about setting up a Mexican corporation:Setup Costs: $1,500–$3,000 USDOngoing Costs: $1,000–$2,000 USD/year (accounting and tax filings)Benefits: Tax deductions for expenses like maintenance, repairs, and managementBest for: Multiple properties or income-generating investmentsWhile a corporation is ideal for managing multiple properties, it’s NOT required to obtain an RFC.