
28 September 2023 | 9 replies
We will be doing a Short Term Rental panel in the coming months, mostly concentrating on the Shenandoah Valley / Massanutten mountain.

29 May 2016 | 18 replies
For example the basement wood paneling because of all the small(some big) cracks I just completely redid the wall with newer wood paneling.

12 October 2023 | 18 replies
Most of my experience is with high end metal wall panel cladding/exterior envelope in the past 10 years but like I said I have built one GU in the last 2 years.

25 October 2023 | 7 replies
You'd have to re-wire the house, so each meter has its own breaker panel and those breakers supply the correct rooms in the house.

26 October 2023 | 32 replies
Guess the Tesla EV has been commoditized but not yet for Solar panels.
20 September 2019 | 29 replies
It is a panel discussion about house hacking so I assume there is a very good chance someone there will have used a 203k loan before.

28 October 2023 | 15 replies
Underground power lines should be buried in Schedule 40 PVC pipe, at the minimum depth required (18” here, or 24” bare), never just running along the ground, there should never be bare wire exposed and anything above grade needs to be run overhead or in Schedule 80 (usually just used for the short length where the line comes out of the ground and goes to the main service panel/ meter).

12 April 2020 | 17 replies
My house was broken into 6 times, stolen materials, tools, pipes, water tanks, panels, even meter boxes.

28 December 2020 | 3 replies
Another option is panelized since you would be replicating the same product, same foundation, same floor system, same truss system.

28 October 2023 | 5 replies
Lots of old garages in Maine have little to no foundation, making them a difficult shell to build up.I attended a Portland panel discussion about ADUs in Maine.