![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/874180/small_1695163684-avatar-mickeyp6.jpg?twic=v1/output=image&v=2)
15 January 2025 | 11 replies
Some more than others. two units had wood floors that we kept.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3119062/small_1726352709-avatar-julesa4.jpg?twic=v1/output=image&v=2)
12 January 2025 | 2 replies
Since you are not doing super high end finishes as mentioned, doing high end flooring and all other stuff just above builder grade does not warrant tile or full wood flooring.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3162388/small_1735533753-avatar-patrickw362.jpg?twic=v1/output=image&v=2)
14 January 2025 | 2 replies
Quote from @Patrick Wood: I am new to real estate investing.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/183540/small_1694802824-avatar-freedomthrure.jpg?twic=v1/output=image&v=2)
25 January 2025 | 18 replies
But otherwise we have had good luck with them.The nice thing about the re-key Kwiksets is you can easily change out the key AND you dont have to worry about stripping the wood by putting in a and changing out a lock.Plus it takes like 2 seconds to re-key the locks.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2571864/small_1733422236-avatar-anthonys817.jpg?twic=v1/output=image&v=2)
23 January 2025 | 14 replies
Type of construction materials for the build(block/metal frame/wood frame), separate utilities, finishes, tech, cleaning crews, any tips and tricks would be HUGE!
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1529811/small_1694577126-avatar-jasons409.jpg?twic=v1/output=image&v=2)
15 January 2025 | 6 replies
Continuous flooring concerns generally apply more to wood flooring, where matching is harder and more expensive.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2301154/small_1668834732-avatar-loganr91.jpg?twic=v1/output=image&v=2)
23 January 2025 | 5 replies
Paint rags and paint plastic $386.66 Initial 70% deposit Cabinets $13,029.02 Backer board, Fiber rock, Shower drains, Zinc backer board screws $385.71 Junk Removal $600.00 red gard ($123.10) Initial 50% deposit Windows $10,493.20 2x4 studs $52.33 Junk Removal $400.00 Flooring sample $6.01 Flooring sample $68.48 Flooring sample $62.62 Flooring sample $132.09 Paint samples for accent wall $38.34 10% Draw for Master bathroom demo $580.00 Wall and shower Tile+Grout-Guest bath $528.62 LVP Flooring $7,165.27 Demo Work $1,275.00 LVP Flooring $7,198.07 Floor tile-Guest bath $889.05 50% down for moisture barrier and animal extraction $2,541.30 Returning flooring samples ($263.19) Paint-2 5gallon buckets SW $382.38 Unsure on what these are $19.54 Unsure on what these are $48.00 Master shower floor tile $331.42 Paint $3,100.00 Flooring underlayment $888.42 Primer $178.71 Paint-5 1gallon buckets SW $180.26 Paint $3,100.00 Appliances $6,820.59 Master bath tub $986.76 Paint-1 5gallon buckets SW $194.81 Primer $268.54 Framing repair for rotted wood $1,000.00 Junk Removal $500.00 Floor tile-Guest bath $771.07 Floor and Shower wall tile-Master $4,559.43 Stair noses $334.20 Master shower floor tile $612.76 Farmhouse sink $385.91 Master ceiling paint $254.29 Drywall repair in kitchen ceiling $500.00 Childrens wall tile and floor tile $3,477.40 Master shower floor tile-Return ($331.43) Drop in sinks for children's bathroom $103.75 Drop in sinks for upstairs bathroom $51.87 Master sinks $147.64 Master floor tile $270.05 Electricity $169.70 16x cement backer board return ($139.60) Tub and shower faucets $414.96 4 x Toilet seats $788.22 Tile install materials for all bathrooms $863.00 Air filters $10.90 Gas pipe and AC tune up+Duct repair $1,216.00 Tile install materials for all bathrooms $984.78 Roll of insulation X2 $38.48 Primer refund $125.33 Shower faucets X2 $480.71 Water $11.41 Master shower floor tile-Return the original white one ($261.55) Demo and materials he bought $1,005.14 Pickup charge for picking up flooring $223.96 Flooring 1st payment $4,000.00 Flooring return-guest bathroom tile ($889.05) Red guard refund $71.34 Backer board, wall tile and floor tile upstairs master return ($134.34) Keys X3 $10.93 Remaining balance for moisture barrier $2,046.30 Subfloor repair $100.00 Flooring $9,900.64 Master tub filler faucet $311.35 Tile labor in all bathrooms $9,202.22 Stair treads and risers $1,160.76 Bathroom painting $2,000.00 Junk Removal $150.00 Return for stair noses ($334.20) Return for flooring ($13,488.73) Flooring $1,900.00 Flooring underlayment $899.35 Trim $1,053.17 Toilet supply lines $13.46 Tile sealer, garage epoxy, garbage disposal $313.00 Return for remaining balance ($1,098.57) Floor reducer $49.99 Garage door opener $267.66 Door hardware (Hinges and door handles) $451.14 Counter tops $5,287.01 Tile return ($981.43) Tile return ($685.14) Tile return ($385.53) Tile return ($153.19) Tile return ($613.13) Flooring $1,900.00 Plumbing and electrical work (Light fix, toilets, drains) $975.00 Light fixtures and faucets $975.49 Junk Removal $125.00 Baseboards $241.45 Switches, outlets, faceplates $234.53 Cabinet balance $5,583.86 Sink return ($155.62) Dining room light and 4 ceiling fans $923.70 Anti skid additive for garage floor $11.38 Flooring $1,900.00 Glidden gel paint $24.01 Paint refund ($1,046.40) Counter tops $2,304.23 Extension rods for ceiling fans $40.64 3 Ceiling fans (one was returned) $573.93 Return grills $100.11 Kitchen and nook light fixtures $283.80 Rod for curtains and toilet paper holder $84.10 Curtain rods $54.60 Garage door deposit $1,185.00 Cleaning $400.00 Water heater $756.18 Thermostat $181.41 Stump Removal $300.00 Dryer cord $28.53 Plumbing and electrical work (Light fix, toilets, drains) $3,525.00 Junk Removal $125.00 Grass seed $71.40 Return of shipping cost ($297.45) Duct cleaning $970.00 Drains for master $46.54 Sold Fridge ($200.00) Bathroom fans $91.92 Samples for brick $29.98 Peg board hooks $20.83 Wall plate covers $21.28 Steel pegboards $140.72 Return stair tread and Riser ($198.14) Pressure washing $1,216.00 Wall plate covers $8.11 Shower door for upstairs $729.83 Powder room counter top $702.99 Light bulbs $59.24 Shower door deposit $1,000.00 Staple gun, staples, supply lines $157.04 Bathtowel hanging hardware $130.89 Light bulbs $29.62 GFCIs, underlayment, downrods ($233.54) Sanding pads $59.10 Yard hanging tools $21.94 Supply line return ($13.12) Stair clips and balusters $779.58 Returned some bathroom tile ($109.05) Peg board hooks $120.04 Front door $3,235.01 Brick sealer $50.81 Bathroom fan light and peg board hooks $71.27 Sanding pads, sanding sheets, etc $38.48 Mirrors $65.84 Mirrors $291.88 Spray bottle for marble sealer $4.34 Brick backsplash $695.54 Sanding pads $2.20 Shelves and shelf brackets for storage room $73.14 Shower door balance $1,000.00 Mirrors $104.26 Returned mirrors ($89.50) Gutters $2,043.15 Floors for finishing room $373.78 Wall plate covers $8.07 Floetrel and hood vent $31.49 Plumbing and electrical work $175.00 Backsplash and fireplace $2,450.00 Trim paint $50.21 Tile for master finish $15.17 Returned something.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1829479/small_1621515928-avatar-roberta410.jpg?twic=v1/output=image&v=2)
20 January 2025 | 62 replies
You can verify us through the following link: https://www.bbb.org/us/ca/wood...You can also verify us through the American Association of Private Lenders (AAPL) lender directory https://aaplonline.com/directo... and PrivateLenderLink.com https://privatelenderlink.com/...Our team has a culmination of over 30 years experience in the mortgage industry.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2117035/small_1679332099-avatar-brucew127.jpg?twic=v1/output=image&v=2)
14 January 2025 | 17 replies
Wood ignites at 700F, fabric a lot sooner.