Melanie Baldridge
!ualify as an RE Pro
24 January 2025 | 0 replies
Spend more than half of your total working hours in an RE business in which you materially participate.2.
Logan Rhea
Thoughts if this property flip Scope of work is too low
23 January 2025 | 5 replies
Paint rags and paint plastic $386.66 Initial 70% deposit Cabinets $13,029.02 Backer board, Fiber rock, Shower drains, Zinc backer board screws $385.71 Junk Removal $600.00 red gard ($123.10) Initial 50% deposit Windows $10,493.20 2x4 studs $52.33 Junk Removal $400.00 Flooring sample $6.01 Flooring sample $68.48 Flooring sample $62.62 Flooring sample $132.09 Paint samples for accent wall $38.34 10% Draw for Master bathroom demo $580.00 Wall and shower Tile+Grout-Guest bath $528.62 LVP Flooring $7,165.27 Demo Work $1,275.00 LVP Flooring $7,198.07 Floor tile-Guest bath $889.05 50% down for moisture barrier and animal extraction $2,541.30 Returning flooring samples ($263.19) Paint-2 5gallon buckets SW $382.38 Unsure on what these are $19.54 Unsure on what these are $48.00 Master shower floor tile $331.42 Paint $3,100.00 Flooring underlayment $888.42 Primer $178.71 Paint-5 1gallon buckets SW $180.26 Paint $3,100.00 Appliances $6,820.59 Master bath tub $986.76 Paint-1 5gallon buckets SW $194.81 Primer $268.54 Framing repair for rotted wood $1,000.00 Junk Removal $500.00 Floor tile-Guest bath $771.07 Floor and Shower wall tile-Master $4,559.43 Stair noses $334.20 Master shower floor tile $612.76 Farmhouse sink $385.91 Master ceiling paint $254.29 Drywall repair in kitchen ceiling $500.00 Childrens wall tile and floor tile $3,477.40 Master shower floor tile-Return ($331.43) Drop in sinks for children's bathroom $103.75 Drop in sinks for upstairs bathroom $51.87 Master sinks $147.64 Master floor tile $270.05 Electricity $169.70 16x cement backer board return ($139.60) Tub and shower faucets $414.96 4 x Toilet seats $788.22 Tile install materials for all bathrooms $863.00 Air filters $10.90 Gas pipe and AC tune up+Duct repair $1,216.00 Tile install materials for all bathrooms $984.78 Roll of insulation X2 $38.48 Primer refund $125.33 Shower faucets X2 $480.71 Water $11.41 Master shower floor tile-Return the original white one ($261.55) Demo and materials he bought $1,005.14 Pickup charge for picking up flooring $223.96 Flooring 1st payment $4,000.00 Flooring return-guest bathroom tile ($889.05) Red guard refund $71.34 Backer board, wall tile and floor tile upstairs master return ($134.34) Keys X3 $10.93 Remaining balance for moisture barrier $2,046.30 Subfloor repair $100.00 Flooring $9,900.64 Master tub filler faucet $311.35 Tile labor in all bathrooms $9,202.22 Stair treads and risers $1,160.76 Bathroom painting $2,000.00 Junk Removal $150.00 Return for stair noses ($334.20) Return for flooring ($13,488.73) Flooring $1,900.00 Flooring underlayment $899.35 Trim $1,053.17 Toilet supply lines $13.46 Tile sealer, garage epoxy, garbage disposal $313.00 Return for remaining balance ($1,098.57) Floor reducer $49.99 Garage door opener $267.66 Door hardware (Hinges and door handles) $451.14 Counter tops $5,287.01 Tile return ($981.43) Tile return ($685.14) Tile return ($385.53) Tile return ($153.19) Tile return ($613.13) Flooring $1,900.00 Plumbing and electrical work (Light fix, toilets, drains) $975.00 Light fixtures and faucets $975.49 Junk Removal $125.00 Baseboards $241.45 Switches, outlets, faceplates $234.53 Cabinet balance $5,583.86 Sink return ($155.62) Dining room light and 4 ceiling fans $923.70 Anti skid additive for garage floor $11.38 Flooring $1,900.00 Glidden gel paint $24.01 Paint refund ($1,046.40) Counter tops $2,304.23 Extension rods for ceiling fans $40.64 3 Ceiling fans (one was returned) $573.93 Return grills $100.11 Kitchen and nook light fixtures $283.80 Rod for curtains and toilet paper holder $84.10 Curtain rods $54.60 Garage door deposit $1,185.00 Cleaning $400.00 Water heater $756.18 Thermostat $181.41 Stump Removal $300.00 Dryer cord $28.53 Plumbing and electrical work (Light fix, toilets, drains) $3,525.00 Junk Removal $125.00 Grass seed $71.40 Return of shipping cost ($297.45) Duct cleaning $970.00 Drains for master $46.54 Sold Fridge ($200.00) Bathroom fans $91.92 Samples for brick $29.98 Peg board hooks $20.83 Wall plate covers $21.28 Steel pegboards $140.72 Return stair tread and Riser ($198.14) Pressure washing $1,216.00 Wall plate covers $8.11 Shower door for upstairs $729.83 Powder room counter top $702.99 Light bulbs $59.24 Shower door deposit $1,000.00 Staple gun, staples, supply lines $157.04 Bathtowel hanging hardware $130.89 Light bulbs $29.62 GFCIs, underlayment, downrods ($233.54) Sanding pads $59.10 Yard hanging tools $21.94 Supply line return ($13.12) Stair clips and balusters $779.58 Returned some bathroom tile ($109.05) Peg board hooks $120.04 Front door $3,235.01 Brick sealer $50.81 Bathroom fan light and peg board hooks $71.27 Sanding pads, sanding sheets, etc $38.48 Mirrors $65.84 Mirrors $291.88 Spray bottle for marble sealer $4.34 Brick backsplash $695.54 Sanding pads $2.20 Shelves and shelf brackets for storage room $73.14 Shower door balance $1,000.00 Mirrors $104.26 Returned mirrors ($89.50) Gutters $2,043.15 Floors for finishing room $373.78 Wall plate covers $8.07 Floetrel and hood vent $31.49 Plumbing and electrical work $175.00 Backsplash and fireplace $2,450.00 Trim paint $50.21 Tile for master finish $15.17 Returned something.
Stacy Banks
Estimates on Foundation &Framing Cost for 1,500 sq ft
22 January 2025 | 2 replies
I'd budget 30k. framing labor in ohio is about $7-$8 per sq ft and materials about the same.
Andrew Lawlor
STR to Custom Home Builds
17 January 2025 | 19 replies
I have spreadsheets filled with material lists for every phase of the build that includes pricing for materials as well as labor, and sources that I use for them.
Jason Sung
Water leak at a bathroom and insurance claim (Safeco)
15 January 2025 | 6 replies
I know lots of installers don't do it, and I personally prefer the unimpeded look, but anything installed outside of the requirements of the material is probably going to be limited, i.e. the insurance company is not going to pay you because the material was not installed according to flooring requirements.
Jake Bute
How to track time in business to accommodate 500+ hours?
9 January 2025 | 7 replies
I'm going off the understanding that you still need to spend 500+ hours in the business to achieve material participation (please correct me if I'm wrong).
Sino U.
Inspection: What to check for duplex
21 January 2025 | 5 replies
Pretend your getting the hardest rain you have ever seen and imagine where the water is going.I would also keep an eye out for sewer lines and type of material.
Cody Caswell
Bathroom Design Tips for Your Flips!
22 January 2025 | 0 replies
These will catch a buyer’s eye in any market, and it's no extra material cost to do so!
Mayer M.
Real Estate Professional Status/Time Tracking
25 January 2025 | 91 replies
You can break it out by general RE activities and material participation.
Anthony Klemm
New to REI, trying to connect with folks
25 January 2025 | 0 replies
I do have a third goal, but too much will happen by the time my second goal materializes that my third goal will likely change drastically.Also, I tend to find myself wanting to ask market-specific questions to agents/lenders/investors/contractors/etc. a lot.