
3 July 2018 | 2 replies
water, electricity, and internet included.

4 July 2018 | 3 replies
We handle everything besides Heavy plumbing, heavy electrical, and pest control.

3 July 2018 | 0 replies
Major foundation changes, plumbing, electrical, etc would likely be off-limits.

3 July 2018 | 7 replies
You are always going to have holding costs (electric, oil/gas, water, etc...).

5 July 2018 | 9 replies
The exterior, the interior, plumbing, electric, HVAC... everything. b) Rent Rolls and Leases This is where the information provided by the landlord is going to matter.

5 July 2018 | 6 replies
The rec building would also have a full kitchen to include multiple refrigerators and stoves for cooking.
5 July 2018 | 4 replies
New floor structure, new layout, new HVAC, updated electricity, new roof, new window package, new water heater… pretty much the works.

8 July 2018 | 13 replies
Framing signed off gets xx%, rough plumbing and electrical gets enough to cover my labor, materials and the sub contractors to that point, insulation inspection sign off another check for labor and materials or subs, once the sheetrock is up and finished is another check, flooring done is another check, etc.

5 August 2018 | 9 replies
526 harwood street, Joliet, IllinoisDuplex x2 (2 bedroom 1 bath), electric heating, window a/c (bottom unit doesn't have a/c), no garageThe current tenants are paying $2,200 total for poor conditions.

22 July 2018 | 4 replies
I'm a little bit confused about the process of going through the MassSave program in a multifamily rental property in which none of the utilities are actually in my name - I was told that setting it up with the electric account number for one of the tenants is the simplest solution, but I'd prefer not to have to go through them to get it all done.