Mona Mohamed
newbie in RE world looking for connections
11 June 2020 | 2 replies
I am from Crown Point ,IN.
Karen Spriggs
Fix & Flip project (my first official)
28 April 2020 | 0 replies
Restoring the house -- adding new HVAC system, resurfacing all walls, painting, replacing light fixtures, and all appliances; carpet, crown molding, etc.
Will Barnard
New Construction completed in Encino, CA
15 January 2020 | 3 replies
Personally I would skip crown moulding on this contemporary of a design.
David H.
What would you do? Sell or Hold?
15 January 2020 | 38 replies
I am definitely interested in scaling up into a larger multi family and love the idea of self storage but honestly don’t have the first idea of how to execute.When I was working as an SBA lender the self storage market was the crown jewel due to its stability.
Chris G.
Complete dump to freaking amazing in less than 3 months
21 November 2014 | 36 replies
The Quartz counters in the bathroom and kitchen got installed today.Major Structural: -100% New Electrical (Wiring, Faceplates, Switches, Fans, Exterior Panel, LADWP feeds, etc) -100% New Copper Plumbing -New Sewer Drainage pipe to LADWP -Brand New Roof (1st layer, House&Garage) -Brand New Gas Water Heater (and moved from kitchen to outside of house) -All brand new windows -Brand New Doors -New Wood laminate floors throughout entire home -New lawn sprinkler system -Custom landscaping with new sod, colored stone, colored mulch, & plants/trees -New wood fence-Crown Moulding Install-All new baseboard installedEntertainment/Convenience Features: -New pantry -Laundry hookups in garage-LED Lighting & Bulbs Throughout -Whole Home Ethernet (Network) Pre-Wired -Living Room Sound System Pre-Installed (4x 6” Spkrs, 1x 8” Center Spkr, Subwoofer Hookup) -Living room HDMI pre-wired for wall-mount TV -6x Recessed Lights in Living Room -Each bedroom has 4x power outlets minimum -Firepit in backyard -Elevated concrete slab section for BBQKitchen: -Custom tile floor w/ pattern -Cappuccino Wood cabinets -Quartz Stone Slab Counters -Spice Racks -Trash storage drawer -Enclosed Surround for up to 36” Fridge -Recessed light over sink -Dishwasher hookupBathroom: -6ft DUAL Master Vanity -Cappuccino Wood cabinets (matching kitchen) -Quartz Stone Slab Counters (matching kitchen) -6 Storage Drawers plus 2 main under sink storages -4.5ft mirror -Custom tile floor -Custom shower/bathtub tile surround -2 Recessed Nooks w/ Interior Colored Glass
Albert Yamoah
General Contractor needed for Dallas area rehab
16 September 2014 | 0 replies
The house needs a basic restore including:Popcorn ceiling removalNew flooring (tile downstairs, carpet upstairs)Paint and wall repairNew ground and crown mouldingPlease point me in the direction of a reputable GC here in the DFW area.
Isaac Swan
Where do you draw the line?!?!
14 November 2013 | 28 replies
So here is the main question I keep getting caught thinking I should do all these things like knock out the wall to create a better floor plan, replace cabinet set to allow for more functional use of space, crown molding, floor boards, ect.
Reese Millican
New member introduction from Boston
18 November 2013 | 8 replies
It is at the Crown Plaza that spans the Pike at Newton Corner.
Michael G.
BPers in Philadelphia : Anyone know NRIA : National Realty Investment Advisors LLC - NY/NJ/ Philadelphia Area ?
7 February 2020 | 109 replies
Any takers that want to take a shot at the crown?
Jason Millar
New Member from East Boston, MA
13 January 2014 | 19 replies
If you are free and interested it is at the Crown Plaza that spans the Pike just over the border in Newton.