Robyn Henderson
New York City Tub Requirements
3 January 2025 | 2 replies
Quote from @Robyn Henderson: My family's 3 unit prewar building in Brooklyn recently had plumbing issues and I'm debating renovating each of the bathrooms.
Chris Summons
Contracts for Sub Contractors to Sign
14 January 2025 | 4 replies
SignaturesThis Agreement is binding upon the parties and their successors.Contractor Signature:[Printed Name] [Date]Subcontractor Signature:[Printed Name] [Date]AttachmentsScope of Work document.Project drawings/plans.Proof of insurance and licenses.Payment schedule.Note: This template is for informational purposes only and should be reviewed by a legal professional to ensure compliance with local laws and regulations.
Nicholas McCormick
STR in Bloomington, Indiana?
23 January 2025 | 9 replies
It looks like there's quite a few regulations in place at least in Nashville, IN (not sure about Bloomington).
Logan Rhea
Thoughts if this property flip Scope of work is too low
23 January 2025 | 5 replies
Paint rags and paint plastic $386.66 Initial 70% deposit Cabinets $13,029.02 Backer board, Fiber rock, Shower drains, Zinc backer board screws $385.71 Junk Removal $600.00 red gard ($123.10) Initial 50% deposit Windows $10,493.20 2x4 studs $52.33 Junk Removal $400.00 Flooring sample $6.01 Flooring sample $68.48 Flooring sample $62.62 Flooring sample $132.09 Paint samples for accent wall $38.34 10% Draw for Master bathroom demo $580.00 Wall and shower Tile+Grout-Guest bath $528.62 LVP Flooring $7,165.27 Demo Work $1,275.00 LVP Flooring $7,198.07 Floor tile-Guest bath $889.05 50% down for moisture barrier and animal extraction $2,541.30 Returning flooring samples ($263.19) Paint-2 5gallon buckets SW $382.38 Unsure on what these are $19.54 Unsure on what these are $48.00 Master shower floor tile $331.42 Paint $3,100.00 Flooring underlayment $888.42 Primer $178.71 Paint-5 1gallon buckets SW $180.26 Paint $3,100.00 Appliances $6,820.59 Master bath tub $986.76 Paint-1 5gallon buckets SW $194.81 Primer $268.54 Framing repair for rotted wood $1,000.00 Junk Removal $500.00 Floor tile-Guest bath $771.07 Floor and Shower wall tile-Master $4,559.43 Stair noses $334.20 Master shower floor tile $612.76 Farmhouse sink $385.91 Master ceiling paint $254.29 Drywall repair in kitchen ceiling $500.00 Childrens wall tile and floor tile $3,477.40 Master shower floor tile-Return ($331.43) Drop in sinks for children's bathroom $103.75 Drop in sinks for upstairs bathroom $51.87 Master sinks $147.64 Master floor tile $270.05 Electricity $169.70 16x cement backer board return ($139.60) Tub and shower faucets $414.96 4 x Toilet seats $788.22 Tile install materials for all bathrooms $863.00 Air filters $10.90 Gas pipe and AC tune up+Duct repair $1,216.00 Tile install materials for all bathrooms $984.78 Roll of insulation X2 $38.48 Primer refund $125.33 Shower faucets X2 $480.71 Water $11.41 Master shower floor tile-Return the original white one ($261.55) Demo and materials he bought $1,005.14 Pickup charge for picking up flooring $223.96 Flooring 1st payment $4,000.00 Flooring return-guest bathroom tile ($889.05) Red guard refund $71.34 Backer board, wall tile and floor tile upstairs master return ($134.34) Keys X3 $10.93 Remaining balance for moisture barrier $2,046.30 Subfloor repair $100.00 Flooring $9,900.64 Master tub filler faucet $311.35 Tile labor in all bathrooms $9,202.22 Stair treads and risers $1,160.76 Bathroom painting $2,000.00 Junk Removal $150.00 Return for stair noses ($334.20) Return for flooring ($13,488.73) Flooring $1,900.00 Flooring underlayment $899.35 Trim $1,053.17 Toilet supply lines $13.46 Tile sealer, garage epoxy, garbage disposal $313.00 Return for remaining balance ($1,098.57) Floor reducer $49.99 Garage door opener $267.66 Door hardware (Hinges and door handles) $451.14 Counter tops $5,287.01 Tile return ($981.43) Tile return ($685.14) Tile return ($385.53) Tile return ($153.19) Tile return ($613.13) Flooring $1,900.00 Plumbing and electrical work (Light fix, toilets, drains) $975.00 Light fixtures and faucets $975.49 Junk Removal $125.00 Baseboards $241.45 Switches, outlets, faceplates $234.53 Cabinet balance $5,583.86 Sink return ($155.62) Dining room light and 4 ceiling fans $923.70 Anti skid additive for garage floor $11.38 Flooring $1,900.00 Glidden gel paint $24.01 Paint refund ($1,046.40) Counter tops $2,304.23 Extension rods for ceiling fans $40.64 3 Ceiling fans (one was returned) $573.93 Return grills $100.11 Kitchen and nook light fixtures $283.80 Rod for curtains and toilet paper holder $84.10 Curtain rods $54.60 Garage door deposit $1,185.00 Cleaning $400.00 Water heater $756.18 Thermostat $181.41 Stump Removal $300.00 Dryer cord $28.53 Plumbing and electrical work (Light fix, toilets, drains) $3,525.00 Junk Removal $125.00 Grass seed $71.40 Return of shipping cost ($297.45) Duct cleaning $970.00 Drains for master $46.54 Sold Fridge ($200.00) Bathroom fans $91.92 Samples for brick $29.98 Peg board hooks $20.83 Wall plate covers $21.28 Steel pegboards $140.72 Return stair tread and Riser ($198.14) Pressure washing $1,216.00 Wall plate covers $8.11 Shower door for upstairs $729.83 Powder room counter top $702.99 Light bulbs $59.24 Shower door deposit $1,000.00 Staple gun, staples, supply lines $157.04 Bathtowel hanging hardware $130.89 Light bulbs $29.62 GFCIs, underlayment, downrods ($233.54) Sanding pads $59.10 Yard hanging tools $21.94 Supply line return ($13.12) Stair clips and balusters $779.58 Returned some bathroom tile ($109.05) Peg board hooks $120.04 Front door $3,235.01 Brick sealer $50.81 Bathroom fan light and peg board hooks $71.27 Sanding pads, sanding sheets, etc $38.48 Mirrors $65.84 Mirrors $291.88 Spray bottle for marble sealer $4.34 Brick backsplash $695.54 Sanding pads $2.20 Shelves and shelf brackets for storage room $73.14 Shower door balance $1,000.00 Mirrors $104.26 Returned mirrors ($89.50) Gutters $2,043.15 Floors for finishing room $373.78 Wall plate covers $8.07 Floetrel and hood vent $31.49 Plumbing and electrical work $175.00 Backsplash and fireplace $2,450.00 Trim paint $50.21 Tile for master finish $15.17 Returned something.
Keith Groshans
Keep Idle Cash Working in SDIRA
15 January 2025 | 8 replies
Another option is to look into some funds as well that allow smaller investments. some are anywhere from 500-$10,000 minimums and accept non accredited investors (through regulation a+).If you ran numbers of a loan paying p&i at 10% but ot being able to reinvest the principal payments you realize how low your returns actually are. so yes notes are great but also understand that idle money for any investment is not fun.
Kiran Asknani
New to STR market in Massachusetts
28 January 2025 | 13 replies
As mentioned above, MA is much more stringent on STR regulations.
Akintunde Aboaba
Seeking Advice on Starting Real Estate Investment in 2025
22 January 2025 | 3 replies
With new regulations in Canada like the flipping tax and property gains tax, I want to be mindful of the risks involved.
Stephanie Medina
Is it a bad idea to convert this LTR into a STR?
26 January 2025 | 17 replies
(We had a boat as an AirBNB and the plumbing would clog very easily and we had to state a similar statement and it got us out of refunds and bad reviews) hope that helps!
Terrence Stark
Builder Refusal to Provide Floor Plans
29 January 2025 | 0 replies
Your designer says we would like to have a copy of the floorplans with the wall heights, window locations, plumbing and electrical.
David Greig
Primary Residence/First Time Homebuyer
26 January 2025 | 0 replies
Also doing all new plumbing and electric service/panel upgrade to 200amps.