
31 July 2019 | 4 replies
I agree with another poster, it looks like some switchgear and breakers for a solar panel.

6 August 2019 | 21 replies
If you're doing a whole house worth, or even a whole apartment, buy the devices and plates in boxes of 10 to get a bit better price.When replacing outlets, move any "back-stabbed" connections to the side terminal screws; this gives you a better connection and reduces the voltage drop in the circuit.

27 July 2019 | 19 replies
In Kansas, my understanding is that you have to have an electrician to tie anything into the breaker box, so you can't DIY much, if any, of this job.

30 July 2019 | 7 replies
My hot tub just started tripping the breaker after being on for a few minutes, and trips again a few minutes later even after the breaker has been reset.

27 July 2019 | 3 replies
Could phase 1 environmental study be a deal breaker?

30 July 2019 | 16 replies
Fuses instead of breakers?

29 July 2019 | 1 reply
It would be nice for the software to understand some aspects about the construction industry but this is not a deal breaker.

1 August 2019 | 67 replies
The issue was that the AC circuit breaker had been tripped off in the breaker box and simply had to be reset!
3 August 2019 | 12 replies
.- 3 months cash reserves typically are required based on monthly PITI payment- health and safety of the property must pass a fha appraisal otherwise repairs will be required to be made (chipped paint, leaks, loose handrails, GFCI (ground fault circuit interrupter) outlets in baths/kitchens/wet areas, holes in sheet rock, double strapped water heaters, CO(carbon monoxide) and CO2 detectors in main living areas, and etc.Those are the general items to utilize FHA financing.Hope that

15 April 2019 | 7 replies
Its a deal breaker for me.