
5 October 2016 | 5 replies
Replacing all light fixtures, faucets, doors, door knobs, ceiling fans, every inch of wall was repainted, all moulding from brown to white, new laminate flooring through the whole first floor and vinyl in the bathrooms, repainted the deck, and really landscaped outside, as well as a brand new porch.

17 November 2016 | 5 replies
Hi and Welcome to Biggerpockets @McCoy W.!All

10 October 2016 | 6 replies
Then you want to get into specifics about the condition of the home.. condition of the: roof, exterior, hvac, water heater, plumbing, floors, walls, etc.

9 October 2016 | 7 replies
I went down to the base and talked to the location assistance office to see if they would pass out my cards to new members coming in or leaving and they told me i could join the wall and pointed over at a wall with flyers and business cards all over it.. there must have been like 50 different realtors pinned to the wall.. so i went down the store and bought a 25 card holder and attached it to the wall and filled it with my cards, about 2 weeks ago i was on base seeing a friend who lives on base in the base housing and decided to knock a few doors to offer assistance in maybe moving off base in the future and the MP's came after about 15 minutes of me knocking doors to let me know the base has strict policies against it...

6 October 2016 | 0 replies
The first line of the promo starts with: Take full advantage of all my “Wall Street” Systems to become a major player in asset acquisition, arbitrage, deal making, and capital formation!

5 January 2017 | 13 replies
Anytime you will be opening walls for any reason - electrical, plumbing, HVAC - you should leverage the situation to air seal and insulate.Can a passive house/passivehaus gut renovation be done economically?

12 October 2016 | 13 replies
Here is a part of the letter, I sent to the seller:The home inspection was completed on September 29th (please see attached) and the following issues were pointed out: 1.The wooden floor frame in the middle unit is deteriorating due to either prior water leak in the bathroom or due to moisture infiltration through the walls and foundation.2.There is evidence of significant settlement under the middle unit bathroom and north closet.3.The settlement of the floor and walls has also resulted in settlement of the roof frame above this area, ceiling shows cracks.4.There is an obvious depression on the roof – water is ponding on the roof above the middle unit, which adds excessive weight on the roof and potential for leaks.5.Asbestos containing material has been found.6.The current bedroom heat installations in the north and south units pose a safety hazard from carbon monoxide, fire and oxygen depletion.7.An electrician performing upgrades did not use ‘arc fault breakers’ in the north and south unit breaker panels, which is required by the national electrical code.8.Upgrades to the electrical system, promised by a real estate agent, have not been completed yet.

4 August 2016 | 8 replies
Where the finished part ends there is a short retaining wall about 2.5 feet tallI've gotten a few very informal estimates for extending the basement back another 5 feet and putting in a small 1 bedroom in-law unit.

12 August 2016 | 10 replies
Every wall and ceiling in the house was papered.

15 August 2016 | 15 replies
Hmm; Just like a day trader on Wall Street, the REI REQUIRES that you understand:the market itselfrules of the engagementand fundamentally, THE NUMBERS!