
6 June 2024 | 7 replies
I will recover this cost of new heating equipment in 2 years through the savings of what I paid this year for heating oil.

6 June 2024 | 1 reply
New mechanicals (electric, plumbing, HVAC), new kitchen, new bathroom upstairs as well as additional bathroom in basement and 1/2 bath on 1st floor, cosmetics throughout, and a finished basement.

8 June 2024 | 37 replies
All the major components have been done like roof, windows, kitchens, baths.

6 June 2024 | 6 replies
Possibly even purchase something that needs some renovations - new kitchen, baths, flooring.

5 June 2024 | 13 replies
Yes, the driveway slopes down; so as you walk further towards the back there are full-size windows on the side of the building where the bedroom and kitchen are.

4 June 2024 | 1 reply
Full rehab of the home to include new primary and secondary bathrooms, installation of new island and coffee nook with granite countertops, new water resistant LVP floors throughout, new paint, crown moulding in living room & kitchen, new electric water heater, and conversion of coat closet to mud room.

4 June 2024 | 6 replies
And don't forget to equip your outdoor space if you have one because that is a major draw.

4 June 2024 | 5 replies
I am trying to find best way to find legit contractors specialized in certain trades (masonry, carpeting, kitchen/bath, etc...)

9 June 2024 | 223 replies
Talk About the Equipment / Fixtures What happens to the equipment and fixtures after the termination agreement is signed?