
2 December 2019 | 7 replies
Initially, everything was pretty smooth, with the exception of having to pull some proverbial teeth to get information on rates and closing costs (4.5-4.75% rate, closing costs were still a bit of a mystery, though).Shortly after the approval from Quicken came through I put an offer in on a $90k property.

1 December 2019 | 9 replies
Didn’t she notice the oozing sores on his face and the fact the guy could only eat pudding because all his teeth fell out ?

25 September 2019 | 4 replies
The other thing I would mention is to use a contract with teeth.

20 September 2019 | 1 reply
REHAB BUDGET and SCOPE OF WORK : $90K ( built into loan) $30K for each Gutted unit$5K per existing unit x6 = $30K TOTAL Spend was $100K $4500 for Foundation issues, landscaping, etc 2 gutted units: new electric- 200 amp upgrade Blown insulation for attic ( r38)new sub floorNew insulation throughout New sheet rock ( 5/8 fire wall for exterior living room walls, kitchen and in stair well) New 6 panel doors throughout with all new satin nickel hardware New 6 panel Steel Front and Rear Entry Doors New plumbingNew HVAC system( all electric got rid of gas) New ThermostatNew lights New Hot water heater New kitchen layout ( removed half wall to open up to living room, built alcove for fridge to increase floor plan) New white shaker cabinets with hardware, countertops , fridge, stove, range hoodNew LVP throughout New Carpet in bedroomsNew bathrooms ( vanity, tub, enamel over steel tubs, tiled surround, vent fans, vanity lights, faucets, low flow toilets, shower heads, and actuators) Added 1 new window in each kitchenOther units: ( completed in 409 B and 407 D ) other units will be rehabbed once tenants move out New LVP in LR, BR, Kitchen and hallwayNew Carpet in BedroomsNew six panel doors/ hardwareGlazed existing tub/tileNew shower hardware Low flow water options ( toilets, shower heads, actuators throughout) New water heaters ( 407 D) Replaced AC 409 A ( it was 28 years old) New Fridge 409ANew Fridge 407CNew Stove 407 A Painted stairwells ( versatile grey) had attractive/durable commercial grade carpet installed on stairsInstalled new lights in stair well and motion sensors in 409 Installed Motion Sensor Flood lights on all the cornersInstalled Video Cameras on problem areasHad Duke Energy replace old lights with brighter LED on two poles Installed keypad entrance for both exterior stairwell entrances Cleaned/ repaired other AC units Fixed any issues with plumbing as neededFixed any issues with existing water heaters Installed new black shutters on both building Implemented quarterly Pest Protection Installed raised landscaped beds for 407 ( parking lot facing) Installed new Numbers for both buildingsPainted all exterior doors black installed new hardwarePainted central mailbox black We are still actively repositioning this property and will have another two tenants moving out end of this month ( September) but the property has generated enough profit from the other units at the increased rental rate that the business will be paying for these upcoming turns.

20 September 2019 | 0 replies
REHAB BUDGET and SCOPE OF WORK : $90K ( built into loan) $30K for each Gutted unit$5K per existing unit x6 = $30K TOTAL Spend was $100K $4500 for Foundation issues, landscaping, etc 2 gutted units: new electric- 200 amp upgrade Blown insulation for attic ( r38)new sub floorNew insulation throughout New sheet rock ( 5/8 fire wall for exterior living room walls, kitchen and in stair well) New 6 panel doors throughout with all new satin nickel hardware New 6 panel Steel Front and Rear Entry Doors New plumbingNew HVAC system( all electric got rid of gas) New ThermostatNew lights New Hot water heater New kitchen layout ( removed half wall to open up to living room, built alcove for fridge to increase floor plan) New white shaker cabinets with hardware, countertops , fridge, stove, range hoodNew LVP throughout New Carpet in bedroomsNew bathrooms ( vanity, tub, enamel over steel tubs, tiled surround, vent fans, vanity lights, faucets, low flow toilets, shower heads, and actuators) Added 1 new window in each kitchenOther units: ( completed in 409 B and 407 D ) other units will be rehabbed once tenants move out New LVP in LR, BR, Kitchen and hallwayNew Carpet in BedroomsNew six panel doors/ hardwareGlazed existing tub/tileNew shower hardware Low flow water options ( toilets, shower heads, actuators throughout) New water heaters ( 407 D) Replaced AC 409 A ( it was 28 years old) New Fridge 409ANew Fridge 407CNew Stove 407 A Painted stairwells ( versatile grey) had attractive/durable commercial grade carpet installed on stairsInstalled new lights in stair well and motion sensors in 409 Installed Motion Sensor Flood lights on all the cornersInstalled Video Cameras on problem areasHad Duke Energy replace old lights with brighter LED on two poles Installed keypad entrance for both exterior stairwell entrances Cleaned/ repaired other AC units Fixed any issues with plumbing as neededFixed any issues with existing water heaters Installed new black shutters on both building Implemented quarterly Pest Protection Installed raised landscaped beds for 407 ( parking lot facing) Installed new Numbers for both buildingsPainted all exterior doors black installed new hardwarePainted central mailbox black We are still actively repositioning this property and will have another two tenants moving out end of this month ( September) but the property has generated enough profit from the other units at the increased rental rate that the business will be paying for these upcoming turns.

15 November 2019 | 7 replies
As easy as this sounds, it's not simple and usually like pulling teeth.

21 November 2019 | 3 replies
Hi Amanda,While I am a CPA, I am now starting to cut my teeth in RE and am by no means a true expert in tax strategies for this industry.

27 March 2020 | 3 replies
About 4 months ago we acquired our first Duplex in Silverton, OR. about 1 month ago I got braces to finally fix my teeth (important since I come from bad poverty).

17 October 2019 | 3 replies
Then start cutting your teeth by getting out there and doing deals.

2 November 2019 | 10 replies
As easy as this sounds, it's not simple and usually like pulling teeth.