![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1841012/small_1694666329-avatar-jesser148.jpg?twic=v1/output=image&v=2)
14 July 2021 | 0 replies
If I want to make a hallway, I would need to demo the bathroom or make the already small room a bit smaller to make way for a hallway.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2197361/small_1626235045-avatar-rayf77.jpg?twic=v1/output=image&v=2)
21 July 2021 | 5 replies
The list goes on but my point is don't go crazy on the demo and create more work.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1658586/small_1623689683-avatar-justinp333.jpg?twic=v1/output=image&v=2)
22 July 2021 | 11 replies
This could get messy.....I found a better method to be this: ask for an invoice for each phase (or so) of work...i.e Demo/Foundation, then Framing, rough, then Electrical/Plumbing /HVAC.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1703367/small_1621514902-avatar-xavierb36.jpg?twic=v1/output=image&v=2)
22 July 2021 | 3 replies
You have two choices, demo the entire lid and add new drywall or get a good drywall crew to skim coat the entire ceiling.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/582243/small_1621493104-avatar-samt31.jpg?twic=v1/output=image&v=2)
21 July 2021 | 7 replies
The demo was was done early on and I have been in touch w/ the contractor at least 10 times and each time he said the project will be fully completed in about two weeks and before the deadline, but he never sent me any photos as I kept asking for.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1833239/small_1621515955-avatar-isaacs116.jpg?twic=v1/output=image&v=2)
23 July 2021 | 2 replies
This will be my first true flip and the job won't be a complete demo or gut.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1497602/small_1621512920-avatar-reidos.jpg?twic=v1/output=image&v=2)
23 July 2021 | 6 replies
Opening wallks means demo, insulation, drywall, mudding, texture, painting,... tasks which adds a lot to the overall project cost.Flooring, painting, cabinets, light fixtures are all pretty straight forward
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2152373/small_1695085296-avatar-micahd54.jpg?twic=v1/output=image&v=2)
29 July 2021 | 3 replies
bought house being a foreclosure. initially bought as a flip. demo house myself. repaired what i could. contracted out what i could not. tried to sell with no success. decided to rent it out and refinance.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2144751/small_1621518305-avatar-leahc58.jpg?twic=v1/output=image&v=2)
25 August 2021 | 5 replies
I had started to demo the bathroom and figured out quickly it was beyond my skill level.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1626432/small_1694739755-avatar-johnh1073.jpg?twic=v1/output=image&v=2)
1 September 2021 | 4 replies
Say you have 9,000,000 into it with legal and demo with leasing broker commission.