Kent Ford
Why Do You Think Texas is a Hotspot for New Real Estate Businesses?
6 November 2024 | 34 replies
Also with stucco siding tile roofs No major weather issues desert landcaping etc etc.. maintenance is quite easy and very cheap compared to other areas of the country.
Account Closed
Wholesale Investment in a Single-Family Residence
3 November 2024 | 0 replies
(optional)Kitchen Remodel (2020): Updated countertops, cabinets, and installed new stainless steel appliances.Bathroom Renovation (2019): Added new tiles, modern fixtures, and a glass shower enclosure in the master bathroom.Finished Basement (2018): Added 600 sq. ft. of finished space, including a family room and home office.New Roof (2021): Replaced the entire roof with new shingles and added improved insulation.Landscaping (2022): Redesigned front and backyard with new plants, sod, and an outdoor seating area.Energy-Efficient Windows (2020): Installed energy-saving windows throughout the home.
Cynthia Leite
Scope of work (SOW)
31 October 2024 | 4 replies
Client Name: Property Adddress: Current Property Type: Post Rehab Property Type: Level of Finishes: List Structural Changes: Final Bed/Bath Count: Exit Strategy (sell or refinance): PHASE 1: PRE-CONSTRUCTION Original Amount Net Adjustments Adjusted Total Description Drawings $ - $ - $ - Permits $ - $ - $ - Expeditor $ - $ - $ - Alarm/Security $ - $ - $ - Temporary Fencing $ - $ - $ - Portable Toilets $ - $ - $ - Engineering Fees $ - $ - $ - Architectural Fees $ - $ - $ - Utilities $ - $ - $ - TOTAL PRE-CONSTRUCTION $ - $ - $ - PHASE 2: DEMOLITION Original Amount Net Adjustments Adjusted Total Description Interior Demo Exterior Demo Dumpsters TOTAL DEMOLITION $ - $ - $ - PHASE 3: CORE AND SHELL Original Amount Net Adjustments Adjusted Total Description Excavation $ - $ - $ - Foundation $ - $ - $ - Underground Plumbing $ - $ - $ - Drain Tile $ - $ - $ - Sump Pump $ - $ - $ - Steel $ - $ - $ - Floor Joists $ - $ - $ - Subfloor $ - $ - $ - Rough Carpentry $ - $ - $ - Interior Stairs $ - $ - $ - Dormer $ - $ - $ - Roof Masonry Siding Windows Exterior Paint Soffit/Fascia Gutters Landscaping Walkways Exterior Doors $ - $ - $ - Exterior Stairs $ - $ - $ - Porch $ - $ - $ - Deck $ - $ - $ - Driveway $ - $ - $ - Garage TOTAL CORE AND SHELL $ - $ - $ - PHASE 4: HVAC Original Amount Net Adjustments Adjusted Total Description HVAC Rough Furnace Condensing Unit & Lineset $ - $ - $ - HVAC Trim $ - $ - $ - TOTAL HVAC $ - $ - $ - PHASE 5: ELECTRICAL Original Amount Net Adjustments Adjusted Total Description Electrical Rough $ - $ - $ - Electrical Finish & Fixtures Low Voltage TOTAL ELECTRICAL $ - $ - $ - PHASE 6: PLUMBING Original Amount Net Adjustments Adjusted Total Description Water Service Upgrade $ - $ - $ - Sewer $ - $ - $ - Plumbing Rough $ - $ - $ - Water Heater $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - TOTAL PLUMBING $ - $ - $ - PHASE 7: DRYWALL AND DOORS Original Amount Net Adjustments Adjusted Total Description Insulation $ - $ - $ - Drywall, Tape, Sand $ - $ - $ - Finish Carpentry (Trim) $ - $ - $ - Interior Doors $ - $ - $ - Interior Paint $ - $ - $ - TOTAL DRYWALL $ - $ - $ - PHASE 8: FLOORS Original Amount Net Adjustments Adjusted Total Description Hardwood Floors $ - $ - $ - Tile Vinyl Carpet $ - $ - $ - TOTAL FLOORS $ - $ - $ - PHASE 9: KITCHEN Original Amount Net Adjustments Adjusted Total Description Cabinets Countertops Backsplash Plumbing Fixtures $ - $ - $ - Light Fixtures Appliances TOTAL KITCHEN $ - $ - $ - PHASE 10: BATHROOMS Original Amount Net Adjustments Adjusted Total Description BATHROOM # 1 Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 1 $ - $ - $ - BATHROOM # 2 Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 2 $ - $ - $ - BATHROOM # 3 - Basement Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower $ - $ - $ - Tile $ - $ - $ - Vanity $ - $ - $ - Countertop $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 3 $ - $ - $ - **Please add itemization of work for additional kitchens or bathrooms** PHASE 11: OPTIONAL Original Amount Net Adjustments Adjusted Total Description Other $ - $ - $ - Fireplace $ - $ - $ - Final Cleaning Staging Stucco Closets General Contractor Fee $ - $ - $ - Finish Carpentry $ - $ - $ - Underpinning $ - $ - $ - Footers $ - $ - $ - Contingency $ - $ - $ - TOTAL OPTIONAL $ - $ - $ - Total Estimated Cost of Repairs $ - $ - $ -
Marc Shin
lower cost alternatives to Quartz / Granite countertops in an STR
5 November 2024 | 22 replies
You could also use tile - though not my personal aesthetic choice.
Sean Regan
Chimney Stack Demo - DIY or Outsource?
4 November 2024 | 9 replies
Inside these chimneys might be clay liner tiles.
Connor Thomas
How to fix this BRRRR when my ARV is less than planned
7 November 2024 | 27 replies
I recommend you confirm that with someone else other than your agent.Food for thought…Insurance related: I’m currently replacing a roof on a house I own, not because the roof is “bad” but because it isn’t possible for the next buyer to get insurance with such an old roof (barrel tile, which lasts longer than the 30 years that insurance companies require).
Julio Gonzalez
Cost Segregation Study on Small Residential Condo
29 October 2024 | 0 replies
Assets identified in this study include:Bathroom Fixtures: Bathtubs, vanities, showers and toiletsStructural Components: Drywall, wood framing and interior partitionsBuilding systems: water heater, electrical distribution, HVAC, plumbingInterior Construction: Wood flooring, stairs, ceramic tileSmoke detectorsThis engineering-based cost segregation study included the following methodology:Physical Inspection through a site visitDocumentation review including architectural plans, accounting records and construction documentsA cost analysis which utilizes engineering principles in order to allocate costs to their applicable asset classificationsCalculation of the depreciation schedule using MACRSAs a reminder, bonus depreciation started to phase out in 2023.
Sol Bergren
vinyl plank flooring is separating
2 November 2024 | 64 replies
Cheap suction cup didn't work for the vinyl plank tiles, but the $30 double suction worked good.
Andre Brock
Tell me about your first ever real estate deal.
21 October 2024 | 3 replies
House was 17 years old all brick rnach house with Andersen windows, solid hardwood floors, gas heat, ceramic tile baths and a new 6 month old roof.
Josh Cochran
Western Wealth Capital: What do you know about them?
31 October 2024 | 37 replies
Another level might be to add tile backsplash and stainless.