
25 August 2019 | 0 replies
This custom home is four (4) bedroom, two and a half (2.5) bathrooms, with a two-story entryway.
25 August 2019 | 1 reply
the place needs flooring, updated kitchen current rating is like 6 out of 10, bathroom same thing. bedrooms are huge. i have around 65k to maybe 75k of total cash for everything. is 20k to 35k enough for rehabbing enough?

28 August 2019 | 2 replies
Purchased the home for $255k and comps show $350-$415 depending on condition of home and if a second bathroom is added.

28 August 2019 | 32 replies
I did a bathroom 2 years ago, I asked for $0 down as it was a local cop and was doing it along with my plumber who was friends with him.

27 August 2019 | 8 replies
As for the interior, needs flooring, sheetrock almost all around the house, bathroom and kitchen need to be redone along with other details.

29 August 2019 | 75 replies
. $2,972.00GCDoors - InteriorRemove and replace bathroom door and frame.

25 September 2019 | 48 replies
I actually signed a two year lease on a place that didn’t have floors or bathrooms yet and they believed me it would like the pictures we showed before they moved in them because they trusted us.

26 August 2019 | 0 replies
Hand textured walls and ceilings, new kitchen and bathrooms, new windows and sliding door, tiled floors throughout the house, painted interior and exterior, replaced water heater, plumbed in a utility sink and built a large workspace in the garage, even tiled the front porch.

26 August 2019 | 1 reply
Hand textured walls and ceilings, new kitchen and bathrooms, new windows and sliding door, tiled floors, painted interior and exterior, replaced water heater, and more.