7 October 2017 | 6 replies
My current plan is to go “Home Depot fancy”- stock cabinets, cheap granite counters, the cheapest stainless steel appliances I can get at a scratch and dent, vinyl plank flooring (other option is to refinish the hardwoods),and wood look porcelain tile in the baths.

3 December 2017 | 6 replies
Is there a list somewhere that says, "putting a kitchen cabinet in should take x" etc.

13 November 2017 | 5 replies
My wife and 8 have full time jobs, we flip houses, and build custom cabinets on side.

5 December 2017 | 1 reply
-Remove popcorn ceiling-Remove carpets-Smooth and paint ceilings-Lay LVT flooring throughout-Remove upper cabinets to open up kitchen-Replace cabinets (kitchen & bathroom)-Replace counters (kitchen & bathroom)-Replace sink (kitchen & bathroom)-Remodel bathrooms-Replace sliding doors for closets w/ mirrored ones-Replaces door frames and doors-Replace knobs/fixtures that we’re painted white-Hang new curtains-Replace ceiling fan and other outdated fixtures-Add baseboards-Remove turf that’s not turf from lanai-Replace with real grass-Lay stone tile for lanai-Replace cracked windowsI’m pretty sure there’s more I need to do but can’t think of it.

6 December 2017 | 6 replies
They messed the railing up on the wall and also seen scratch marks on the one cabinet so they must have had a pet.

29 January 2018 | 1 reply
3bds, 2 baths, living rm and dining rm. new everything. siding, appliances, cabinet, laminate floor for kitchen and all the rooms.

15 March 2018 | 8 replies
@Stanley J Okazaki-writing into the contract that the tenant is responsible for the first $100 of any repairIf you charge the tenants, you'll never hear about a simple leak under the sink due to a failed $1 p-trap washer, and will instead find a rotted cabinet bottom and/or floor after they move out.

7 April 2018 | 10 replies
The project is almost done with final expenses including paying granite, cabinets, labor for tile, final plumbing and electrical.

8 May 2018 | 4 replies
These cabinets are over 30yrs old

22 September 2018 | 38 replies
Once they inspect they disburse the funds to us that are associated with that draw.The work does not have to be done in the order the draws are numbered, but all of the work for a given draw has to be done before getting the disbursement.Draw 1 Roof ReplacementDraw 2 Repair plumbing as needed & install 1 hot water heaterDraw 3Renovate 1st floor apartmentNew countertop & paint cabinetsreplace flooring throughoutpaint throughoutDraw 4Renovate 2nd and 3rd floor apartment Paint ThroughoutFlooring Throughoutnew countertop, add lower cabinets, & paint cabinetsrework 2nd floor layoutnew appliancesreplace 2nd floor bathroom vanityDraw 5 Outside work: paint where needed, take down front ramp, trim where neededDraw 6 Common area painting