![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/616342/small_1621493880-avatar-sethb14.jpg?twic=v1/output=image&v=2)
24 January 2018 | 18 replies
Most of my tenants are students, and/or restaurant and/or walmart workers.
28 February 2018 | 4 replies
A google search of emerging quick service restaurants will provide you a list of some prospects to call on.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/859018/small_1621504565-avatar-janinec9.jpg?twic=v1/output=image&v=2)
26 January 2018 | 40 replies
And landlords that have enrolled must also cooperate (the C in the middle) when PGW seeks a shut off - and that won't happen until April 1 due to PA PUC shut off moratorium over winter.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/827434/small_1621499723-avatar-davidjones3.jpg?twic=v1/output=image&v=2)
14 July 2020 | 8 replies
Beautiful mountains, great beer, legal weed, burgeoning restaurant and cultural scene, and 300 days of sunshine.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/212718/small_1621433613-avatar-mfullam.jpg?twic=v1/output=image&v=2)
29 August 2018 | 90 replies
If the city sees that you are trying to remedy a violation that is not of your doing they will likely work with you to get him removed faster and shut down his operation.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/577125/small_1704446139-avatar-roberth133.jpg?twic=v1/output=image&v=2)
28 October 2019 | 14 replies
Going to the hamburger analogy, if you have never been to a hamburger restaurant and never eaten a hamburger, how do you pick which place to go?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/671711/small_1621495159-avatar-jimg41.jpg?twic=v1/output=image&v=2)
20 May 2018 | 29 replies
It wasn't until 5 months after this all started (and they tried to shut off the tenants' water) that we got a letter letting us know the situation.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/604710/small_1695202315-avatar-felixl7.jpg?twic=v1/output=image&v=2)
21 January 2018 | 11 replies
so I was supposed to have my closing this Friday on a HUD home but my agent told me today that because of this government shut down we can’t proceed with the closing yet. im not a big politics guy so I wasn’t aware of this. does anyone’s have anymore info or a solution to help me out?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/468482/small_1621478020-avatar-brentf5.jpg?twic=v1/output=image&v=2)
27 January 2018 | 6 replies
Monthly Expenses = $2800 Per Month: Current Management Team = $1000.00Insurance = $224.00Real Estate Taxes = $92.00Fiber Optic High Speed Internet = $89.00Cable TV = $52.00Trash Dumpster = $55.00Sewer / Water = $186.00Natural Gas (average) = $142.00Electric = $327.00Housekeeping = $270.00Ongoing supplies = $230.00Maintenance = $133.00Total Renovation The renovation started in 2011 and was completed 2016 with entire complex being gutted to the studs, then completely rebuilt fully furnished inside and out to new standards, as follows: 26 gauge top of the line triple epoxy coated metal roof26 gauge top of the line triple epoxy coated awning and patio coverSingle hung gas filled energy efficient EZ clean vinyl tip-out windows4 new natural gas water heatersAll new plumbing throughout entire complex/buildingOnly #1 Grade Premium lumber was used throughout entire renovationQuality Price Pfister plumbing fixtures and lifetime parts180 feet of new 4 inch sewer line from the building to the street tapNew premium exterior fiberglass dimensional Colonial style entry door with new door jams, aluminum thresholds, all new lock sets and peep holesCustom picture framed windows with decorative edging and exterior door trim to matchCommercial toilets: all new PEX plumbing, shut off valves, bullets, supply lines, hose bibs, angle stopsNew attic and wall insulation with vapor barrierUpgraded electrical, HE lighting, new fixtures, switches, outlets, breakers, energy efficient lighting, vapor lights, rope lighting and HE flood lightsCustom artistic signage (3) built by Management TeamNew drywall, texture and highest quality Valspar paint throughoutAll exterior wood was hand primed and hand paintedNew vinyl fencing for corner lotPremium Quality pillow top mattressesNew hand textured walls (office), ceiling and covered entryNew concrete sidewalks, kitchens, baths, showers stalls, toilets, vanities, cabinents, counter tops, sinks, refrigerators, microwaves, deep freezers, dryers, A/C units, flat screen TVsAll work has been documents and permitted
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/468482/small_1621478020-avatar-brentf5.jpg?twic=v1/output=image&v=2)
22 January 2018 | 0 replies
Monthly Expenses = $2800 Per Month: Current Management Team = $1000.00Insurance = $224.00Real Estate Taxes = $92.00Fiber Optic High Speed Internet = $89.00Cable TV = $52.00Trash Dumpster = $55.00Sewer / Water = $186.00Natural Gas (average) = $142.00Electric = $327.00Housekeeping = $270.00Ongoing supplies = $230.00Maintenance = $133.00Total RenovationThe renovation started in 2011 and was completed 2016 with entire complex being gutted to the studs, then completely rebuilt fully furnished inside and out to new standards, as follows: 26 gauge top of the line triple epoxy coated metal roof26 gauge top of the line triple epoxy coated awning and patio coverSingle hung gas filled energy efficient EZ clean vinyl tip-out windows4 new natural gas water heatersAll new plumbing throughout entire complex/buildingOnly #1 Grade Premium lumber was used throughout entire renovationQuality Price Pfister plumbing fixtures and lifetime parts180 feet of new 4 inch sewer line from the building to the street tapNew premium exterior fiberglass dimensional Colonial style entry door with new door jams, aluminum thresholds, all new lock sets and peep holesCustom picture framed windows with decorative edging and exterior door trim to matchCommercial toilets: all new PEX plumbing, shut off valves, bullets, supply lines, hose bibs, angle stopsNew attic and wall insulation with vapor barrierUpgraded electrical, HE lighting, new fixtures, switches, outlets, breakers, energy efficient lighting, vapor lights, rope lighting and HE flood lightsCustom artistic signage (3) built by Management TeamNew drywall, texture and highest quality Valspar paint throughoutAll exterior wood was hand primed and hand paintedNew vinyl fencing for corner lotPremium Quality pillow top mattressesNew hand textured walls (office), ceiling and covered entryNew concrete sidewalks, kitchens, baths, showers stalls, toilets, vanities, cabinents, counter tops, sinks, refrigerators, microwaves, deep freezers, dryers, A/C units, flat screen TVsAll work has been documents and permitted