
12 June 2024 | 11 replies
It appears to be an easy installation process as well.

14 June 2024 | 9 replies
The next stage would be to install sheetrock on walls and ceiling, waterproof bathroom walls and install tiles, finished flooring, new kitchen cabinets and appliance, install bathroom fixtures.The problem is time.

16 June 2024 | 15 replies
The designated responsible party must be available on-site to address any issues as soon as one (1) hour following notification from an occupant, a city official, a code compliance officer, or law enforcement officer.Prior to the city issuing a certificate of registration, the vacation rental is subject to inspection to ensure compliance with: (1) minimum safety requirements under section 34.5-12; (2) minimum information requirements under section 34.5-13; and (3) to confirm compliance with Chapter 34.5 generally as well as any other applicable provisions of the Sarasota City Code and Zoning Code.The minimum safety requirements are set forth in section 34.5-12 and include compliance with the Residential Swimming Pool Safety Act, operation of smoke and carbon monoxide detection systems, and installation of fire extinguishers.The minimum informational requirements are set forth in section 34.5-13 and include, among other things, providing: (1) the location of the nearest hospital; (2) the non-emergency police telephone number; (3) the dates and approximate times of trash and recycling pick up; (4) the street address of the vacation rental; (5) the name and phone number of the designated responsible party or parties; and (6) emergency evacuation instructions.

14 June 2024 | 3 replies
Purchase price: $Cash invested: $Completely renovated SFH, 3/2, built in 1999, 1214 sq ft with a new roof installed in April 2024, state-of-the-art smart LG appliances, and luxury vinyl plank flooring throughout.

14 June 2024 | 1 reply
The high rate of electric vehicle charging installation and solar installations are making these kinds of electrical parts hard to find.

15 June 2024 | 5 replies
Example: if a ceiling light needed to be moved and/or installed, I'd highlight where it should go (with dimensions noted) and give that to the electrician.
13 June 2024 | 1 reply
The majority of my work is full shower demo/remodel/new tile install. I

14 June 2024 | 28 replies
I have a 6 bedroom septic installed on the lot and in the future will add an additional cabin.

15 June 2024 | 30 replies
Lastly, when i try and call them to speak to my property manager 99% of the time I wind up having to submit a note in their portal and wait for a call back.As to to the new garage door that will be installed by the tenant, I wish they would be more involved, giving the tenant some options of companies to call, and to walk them through the repair process.Am i wrong in any of these thoughts or concerns about my current PM---or---do i need to let the property manager do their thing and learn to take a step back?

16 June 2024 | 23 replies
Install world class security/camera alert systems3.