
7 February 2017 | 12 replies
I did completely renovate the rest of the units, kitchen, baths, floors, etc so I don't expect to have major expenses aside from the ones I mentioned.

1 September 2017 | 7 replies
We are putting in new floors, total paint job inside and out, new kitchen.

19 February 2017 | 8 replies
They can't handle the paint and floors though.

8 February 2017 | 19 replies
The seller told us, the house needs EVERYTHING, from roof, kitchen, bathroom, floor, wall, ceiling, lights, lawn, doors, it's pretty much a big rehab.

6 February 2017 | 22 replies
Ok BP family finally got my first house that I will be house hacking in a few (hopefully) but I'm having a issue with the first floor tenant.

12 February 2017 | 3 replies
(HVAC and water heater are end of life, plus needs interior/exterior paint, flooring, and other significant but not major issues).
6 February 2017 | 2 replies
I'd personally be doing the framing, floors, sheetrock, HVAC, among other things.

6 February 2017 | 7 replies
It would be a good ideal to paint all treated areas with a stain blocking primer including the wood members, studs and sub-flooring if affected.

9 February 2018 | 12 replies
Also keep in mind that if the basement is below grade it won't meet minimum standards of fitness for human habitation:"No room or area in a dwelling may be used for habitation if more than 1⁄2 of its floor-to-ceiling height is below the average grade of the adjoining ground and is subject to chronic dampness."

14 March 2017 | 9 replies
New flooring throughout, 2 completely redone bathrooms, took down walls to open the place up a bit, new doors, fresh paint, some crown, lots of patching, light kitchen remodel that include granite tops and an island with concrete top, new dishwasher and range, new HVAC units, moved some electrical around, new garage door, some fresh landscaping, added a fire pit, and gave the porch a facelift with some new posts.