13 April 2022 | 6 replies
The ARV stabilized value is $3.35 millionI paid out of pocket for the land and Design/engineering after LTC my loan will be $2.34 millionit is 15 units at on average $1400 per unit.

4 April 2022 | 3 replies
It still goes through the structural engineering approval process.Thanks for the help.

2 April 2022 | 1 reply
I have been working with an engineer for a few months to subdivide the property but the process is being very slow.

3 April 2022 | 3 replies
I am looking for a structural engineer in the Raleigh, NC area that can come out within the next week to give a report of what it needs to be fixed before due diligence period ends.

16 April 2022 | 9 replies
I've had some contractors tell me that I need to bring in an architect to draw up plans and an engineer to make sure its viable then get a couple permits, etc.

18 April 2022 | 15 replies
He quit his job as a general motors engineer with just three rentals.

7 April 2022 | 0 replies
I'm planning on using contractors on this one, but not sure what can be done with no permits vs EZ permits vs some other building permits and where and when I might need engineers and inspectors to review plans and ensure that work is being done to the permit standards.

10 April 2022 | 5 replies
DuckDuckGo is an alternative search engine.

20 April 2022 | 15 replies
If you want to build a spaceship, you don't go ask an engineering forum: "I have zero education, zero money, no time, ... how do I build a spaceship and go to Mars".

10 April 2022 | 9 replies
Your attic floors are likely not engineered for a live load.