![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2077108/small_1628176960-avatar-marshalls34.jpg?twic=v1/output=image&v=2)
8 November 2021 | 7 replies
Or find a bank that's faster
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1641035/small_1621514394-avatar-jessical175.jpg?twic=v1/output=image&v=2)
6 September 2021 | 15 replies
Once plans were signed off, I had my contractor go full speed ahead and start demo and framing to get to point where the city need to do the inspection.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1425932/small_1626462962-avatar-noahg27.jpg?twic=v1/output=image&v=2)
13 May 2020 | 100 replies
We are seeing the speed to market and getting rented over the past month and a like what we see - a lot!
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1060510/small_1621508247-avatar-ashleyz6.jpg?twic=v1/output=image&v=2)
23 August 2022 | 1 reply
You'll need someone that has their own crews because you'll need speed to stay ahead of material payments; once you have anything realistic on the ground you can work on pre-selling the house.Or you can split the property into lots and just sell each individual lot.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2267619/small_1661213810-avatar-kylevogeler.jpg?twic=v1/output=image&v=2)
27 July 2022 | 16 replies
If you segregate the two projects, the Apartment project can move forward at its own speed.2.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1460316/small_1621512511-avatar-reynaldb.jpg?twic=v1/output=image&v=2)
22 July 2019 | 12 replies
If you’re not set on location, Jersey City might be more your speed.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1451172/small_1626138250-avatar-anthonyt208.jpg?twic=v1/output=image&v=2)
19 July 2019 | 9 replies
There is also a great meetup hosted by @Melanie McDaniel that will get you plugged in and up to speed in no time!
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/739659/small_1621496455-avatar-marcuscann.jpg?twic=v1/output=image&v=2)
3 February 2020 | 12 replies
@Marcus CannadyA hard money lender should be on speed dial for this one.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/857027/small_1621504537-avatar-jasonh270.jpg?twic=v1/output=image&v=2)
21 November 2019 | 7 replies
Started the process today...and here we are@James Carlson - I know from attending one of your AirBNB presentations last year that you're very up to speed on CO & Denver AirBNB best practices.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/468482/small_1621478020-avatar-brentf5.jpg?twic=v1/output=image&v=2)
22 January 2018 | 0 replies
Monthly Expenses = $2800 Per Month: Current Management Team = $1000.00Insurance = $224.00Real Estate Taxes = $92.00Fiber Optic High Speed Internet = $89.00Cable TV = $52.00Trash Dumpster = $55.00Sewer / Water = $186.00Natural Gas (average) = $142.00Electric = $327.00Housekeeping = $270.00Ongoing supplies = $230.00Maintenance = $133.00Total RenovationThe renovation started in 2011 and was completed 2016 with entire complex being gutted to the studs, then completely rebuilt fully furnished inside and out to new standards, as follows: 26 gauge top of the line triple epoxy coated metal roof26 gauge top of the line triple epoxy coated awning and patio coverSingle hung gas filled energy efficient EZ clean vinyl tip-out windows4 new natural gas water heatersAll new plumbing throughout entire complex/buildingOnly #1 Grade Premium lumber was used throughout entire renovationQuality Price Pfister plumbing fixtures and lifetime parts180 feet of new 4 inch sewer line from the building to the street tapNew premium exterior fiberglass dimensional Colonial style entry door with new door jams, aluminum thresholds, all new lock sets and peep holesCustom picture framed windows with decorative edging and exterior door trim to matchCommercial toilets: all new PEX plumbing, shut off valves, bullets, supply lines, hose bibs, angle stopsNew attic and wall insulation with vapor barrierUpgraded electrical, HE lighting, new fixtures, switches, outlets, breakers, energy efficient lighting, vapor lights, rope lighting and HE flood lightsCustom artistic signage (3) built by Management TeamNew drywall, texture and highest quality Valspar paint throughoutAll exterior wood was hand primed and hand paintedNew vinyl fencing for corner lotPremium Quality pillow top mattressesNew hand textured walls (office), ceiling and covered entryNew concrete sidewalks, kitchens, baths, showers stalls, toilets, vanities, cabinents, counter tops, sinks, refrigerators, microwaves, deep freezers, dryers, A/C units, flat screen TVsAll work has been documents and permitted