Skip to content
×
Try PRO Free Today!
BiggerPockets Pro offers you a comprehensive suite of tools and resources
Market and Deal Finder Tools
Deal Analysis Calculators
Property Management Software
Exclusive discounts to Home Depot, RentRedi, and more
$0
7 days free
$828/yr or $69/mo when billed monthly.
$390/yr or $32.5/mo when billed annually.
7 days free. Cancel anytime.
Already a Pro Member? Sign in here
Pick markets, find deals, analyze and manage properties. Try BiggerPockets PRO.
x
Results (10,000+)
Idan Narotzki Who is responsible?
23 August 2019 | 17 replies
We tend to push the limit with a 10-day grass cutting schedule for the properties we need to tend to the grass. 
Cade Andersen First Flip Offer Accepted
26 September 2019 | 19 replies
@David AbbateYes I got an initial inspection because he is a friend the fine tooth comb one is tomorrow.
P. Cano-Desso Cleaning BEFORE painters arrive
21 September 2019 | 4 replies
It is normal for the cleaners to be the last thing scheduled.
Brian Phillips Fair price for professional engineer to make permit drawings?
14 November 2019 | 14 replies
This will make the last unit viable.Minimum drawing requirements include, but are not limited to:Bear the seal of a register design professional, in compliance with Sections 33791.01, 4703.12, and 4733.14 of the Ohio Revised code.Plans shall be drawn to scale and shall be sufficiently clear, comprehensive, detailed, and legible so that a determination can be made for conformance with all of the applicable provisions of the currently adopted codes.Mechanical plans: unit types and sizes, system layout, ventilation requirements, and provisions, and control system diagram.Electrical plans: riser diagram including provisions for grounding, panel board schedules, lighting plan(s) and circuiting, power plan(s) and circuiting, and special systems plans.Energy calculations.Provide a site plan showing to scale the size and location of new contruction and all existing structures on the site, including setback and side yard dimensions, all property and interior lot lines, distances from lot lines, the locations of the nearest streets, the established street grades, types and sizes of all utility lines and the elevations of the proposed finished grades; drawn in accordance with an accurate boundary line survey.Submit plumbing plans and details that locate and describe all fixtures, fixture schedules, and show compliance to handicapped accessibility.
Dustin S. Self Directed Roth after FIRE
14 November 2019 | 6 replies
@Dustin SalmonAssuming you can have a Solo 401k (self-employed with no full-time employees), here is a framework of determining whether you can contribute this income to a Solo 401k:1) The threshold issue is whether this income is earned self-employment income (e.g. reported on Schedule C in the case of single-member LLC that is taxed as a disregarded entity).
Kevin Cieslukowski Harrisburg PA - in town visiting family & looking at property
23 November 2019 | 2 replies
Meetup does not have anything scheduled In Hburg I think but you should double check me.
Adam J. Motion to Vacate Foreclosure in FL
14 November 2019 | 1 reply
Owners apparently made some Payments out the blue apparently to the bank and they “forgot” to cancel the scheduled auction.
Jeff Ostrander [Calc Review] Help me analyze this deal
27 November 2019 | 8 replies
Why aren"t you using a 30 year amortization schedule?
Duncan Banks Down payment challenges
18 January 2020 | 8 replies
Just like every other loan, run the amortization schedule and see where you break even is between the costs.
Julie Berks Any other SAHM/ WAHM missing out on networking events?
30 January 2020 | 4 replies
Denver is an amazing place to network and attend educational events, however I often find myself in scheduling conflicts and definitely feel like I can not take full advantage of these opportunities.