3 September 2014 | 3 replies
Digging down in the basement will involve an engineer and the permitting process.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/222391/small_1621434286-avatar-lgchicago.jpg?twic=v1/output=image&v=2)
20 October 2014 | 9 replies
As a marketing pro, you've got the RIGHT STUFF for this business.The best marketing techniques are:1) Pay per click (search engine marketing/Google)2) Direct mail3) Bandit signs (where legal)We use many other techniques, but I think you need to have a core marketing strategy based on using those methods above, and then you can add other aspects - such as electronic billboards, door hangers, car wraps, etc.Wholesaling is ALL about marketing.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/71233/small_1621414492-avatar-jthomasmartin1.jpg?twic=v1/output=image&v=2)
13 February 2015 | 54 replies
It ended up costing around 12k extra in engineering, concrete, piers, etc.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/161792/small_1621420350-avatar-teamlb.jpg?twic=v1/output=image&v=2)
23 October 2014 | 1 reply
Greetings, My partner and I are in need of referrals to find a Foundation and or Structural Engineer contract, who is experience within Colorado Springs?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/237144/small_1621435314-avatar-dperrott.jpg?twic=v1/output=image&v=2)
23 October 2014 | 8 replies
Dan,Let me start by saying that I'm an engineer, so I'm ultra-focused on the blend of cost-durability-functionality-cosmetics in all of our spending decisions.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/697/small_1621345528-avatar-roc.jpg?twic=v1/output=image&v=2)
23 October 2014 | 4 replies
We call them Deltas because there is no delta (an engineering term for difference between two values) between the loan and the current market value.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/206440/small_1621433173-avatar-bjcheely.jpg?twic=v1/output=image&v=2)
24 October 2014 | 10 replies
I know during college there are times I switched room with others, just because one semester I am staying at the engineering lab late at night all the time, and instead of waking everyone up at 3am when I come home, I offered to move to the front bedroom and the other guy moves to the back.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/100206/small_1648155178-avatar-kaseybvillareal.jpg?twic=v1/output=image&v=2)
27 February 2017 | 15 replies
Engineered is a lot cheaper up front, but the real stuff can be re-finished a dozen times and can last decades.Provide nice-quality welcome mats at each door, and floor mats inside each door.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/233949/small_1694992037-avatar-poduse.jpg?twic=v1/output=image&v=2)
25 October 2014 | 7 replies
Phil, I'm a beginner in real estate but I'm an engineer that specializes in protecting buildings from flood and hurricane damage.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/241844/small_1621435630-avatar-boyd2free.jpg?twic=v1/output=image&v=2)
24 October 2014 | 9 replies
I currently work in the oil and gas business as a Chief Engineer(Ships) for 14 years.