James Allen
First Time Atlanta Flipper Needs Advice!!
3 August 2017 | 12 replies
Demo Total Bath and kitchen Walls and ceilings Windows, doors and trim Floors where damaged Rent dumpsters Total labor 5580 Exterior Painting Pressure wash house Caulk where needed Paint house Total labor and estimated materials 4850 Foundation Reinforce existing footings Replace floor joists where needed and install new subfloors Install new floor joists in addition to level with existing house Total labor and estimated materials 8875 Plumbing Replace pipes throughout Run new pipes to accommodate new layout Replace main water line Total labor and materials 7500 Insulation Install insulation in attic Install insulation on walls Total labor and materials 4580 Electrical Update electrical throughout Total labor and materials 7850 HVAC Install a new HVAC system Install new duct work Total labor and materials 5890 Interior work Total Open up living room to dining room Create 3 bedrooms and 3 baths Install sheetrock on walls and ceilings Mud, sand and prime walls and ceilings Total labor and estimated materials 12785 Trim work Install baseboards throughout Install trim around windows and doors casing Install new interior doors Total labor and estimated materials 4850 Interior Painting Paint ceilings Paint walls Paint trim Total labor and estimated materials 3580 Wood Floors Repair wood floors Install new floors in addition Sand and stain floors throughout Total labor and materials 6750 Master Bath Build a concrete pam in shower Install hardy boards on walls and floor Install tile on floor and walls throughout Install sink cabinets, toilet, and faucets Install light fixtures and accessories, install glass shower door Total labor and estimated materials 7500 Guest bath Install tub Install hardy boards on walls and floor Install tile on floor and walls Install faucets, sink, and toilet Install light fixtures and accessories Total labor and estimated materials 5750 Guest bath Total Install tub Install hardy boards on walls and floor Install tile on floor and walls throughout Install faucets, sink, and toilet Install light fixtures and accessories Total labor and estimated materials 5750 Kitchen Install hardy boards on floor Install tile on floor Install cabinets Install sink and faucet Install door knobs Install granite and backsplash Total labor and estimated materials 7500 Roof Remove old shingles and repair plywood Install new shingles (25 year warranty).
James Reyes
Funds for some work for upper rental in possible house hacking
5 August 2017 | 3 replies
Repairs and final inspection completed lesser of 90 days or as approved by the Renovation departmentMaximum repairs 25% of the after complete value.Roof: repair or replacement (covering, underlayment)Gutters/downspouts: install/repair/replaceInsulation: ceilings/walls/asbestos removalSiding/windows/doorsPaint: interior/exterior/lead paint abatementKitchen: all appliances/cabinets/ totalElectrical: repair/replace/recondition allPlumbing: repair/replace/recondition allRepair/Replace HVAC or other systemsRepairing or removing an in-ground swimming poolInstalling or repairing fences, walkways and drivewaysFlooring/subflooring/tile/carpet/woodTermite treatment/damage repairRepairing or replacement of well and septic- *See appraisal section of the guidelines for specific requirementsWeatherization items/repairs/ improvementsFoundation RepairRepairs not allowed by the program.
Ryan Monier
Potential tenant wants to pay 1 years rent up front!
9 August 2017 | 19 replies
I sometimes get students who pay with student loans to pay every 6 months, when they get their loan disbursement.Regardless, make sure he understands that you do regular inspections of the interior of the home to make sure it's safe.
Ruth Escobar
First time home buyer - KB Homes
9 August 2017 | 2 replies
It needs minor repairs (carpet changed, deep cleaning and paint interior).
Ruth Escobar
First time home buyer - KB Homes
15 August 2017 | 7 replies
It needs minor repairs (carpet changed, deep cleaning and paint interior).
Michael C.
Its GO TIME. Second opinion please
11 August 2017 | 19 replies
@Andrew Syrios I purposely left the after repair value at zero percent increase to plan for the worst case scenario I think after some of the improvements I make I will get a bit of value but I don't know who to talk to about how much and what to do to maximize the price jump the Interior of the place is pretty decent. minor exterior upgrades could really help out the curb appeal. thanks
Scott Graham
Fire Remediation Costs in Southern NH??
8 August 2017 | 1 reply
Anyone familiar with how much it will cost to do an interior fire remediation on a 2,000 SF single family home in southern NH?
Elliot Blanford
What would make this property work for you?
10 August 2017 | 7 replies
I haven't seen the inside, but who would sell a $1M property without a single interior photo (This screams it probably couldn't pass any safety codes).
David Siegel
New to Bigger Pockets
15 August 2017 | 4 replies
I've spent an entire year remodeling the interior, every weekend, about 10 - 16 hours per weekend for an entire year!
Brady Carpenter
Newbie seeking help with collegetown apartment complex
14 August 2017 | 1 reply
I need to see it in person first but with what looks like small exterior renovation and probably some interior this could generate great cashflow.