Brad Roche
FHA 203(k) vs. Fannie Mae Homestyle Renovation Loan
13 January 2025 | 5 replies
., adding rooms, bathrooms)-Cosmetic Enhancements-Eliminate Health and Safety Hazards-Energy Efficiency Improvements-Major Landscaping (e.g., grading, tree removal, adding walkways)Non-Acceptable Renovations:-Luxury Items-Commercial Use-Temporary Structures-Non-Residential BuildingsBoth of these renovation loans are similar in many ways, but the key differences are:1.
Braeden Warg
What to pull permits on
27 January 2025 | 8 replies
It took a lot to comply with their permit expectations and was frustrating and time consuming.
David B.
“Live In” Flip Advice!!
14 January 2025 | 10 replies
This creates an initial negative equity position that consumes the initial cash flow, sometimes for many years.
Cherie Carr
Track Driving for Dollars?
10 January 2025 | 2 replies
It also allows you to search 400 property and property owner consumer fields, in addition to being a driving for dollars tool.
Garry Lawrence
Mass Shooting Near Property I'm About to Buy – Should I Back Out?
12 January 2025 | 7 replies
Before buying or renting in an unfamiliar neighborhood, you should check the following two sites: SpotCrime, AreaVibes,These sites provide valuable information, including Livability Scores, which cover aspects such as crime rates, employment, health, housing, schools, shopping, and more.well, anything can happen anywhere.
Ronald Rohde
10 Year Treasury Keeps Going UP!
29 January 2025 | 12 replies
Consumer debt- US is tapped out.
Marisela Arechiga
To ADU or to Purchase Another?
14 January 2025 | 8 replies
This negative position can consume years of cash flow to recover.
Ryan Ruppert
Shopify for own STR website?
20 January 2025 | 7 replies
I have experience building my own DTC consumer goods type sites so I was planning to build my own.
Michael Reilman
Best Low-Flow Toilets?
17 January 2025 | 14 replies
Consumer reports even has a report about how they're better than all the $300+ toilets.
Robert Liu
New build with delta build services in Cape Coral
22 January 2025 | 66 replies
Approved Septic System Design from Lee Health Department (8-12 Weeks) The clock for the commencement of construction starts once the slab is poured and approved by the city inspectors, this is detailed in Section 8 of your build contract.