
31 January 2022 | 0 replies
Add 1 bedroom to the house, HVAC and ducting throughout , rewired interior electrical, all new dual pane windows, replaced doors, new carpeting in the bedrooms and wood plank flooring in the living room, tile in kitchen and bath, added new baseboards and painted interior, replaced all doors in the house, granite countertops, new cabinets, all new appliances, a laundry room / new closet, remodeled bathroom, new tile in shower, redid some roofing, and painted the entire exterior.

2 February 2022 | 8 replies
You can expect to pay $10k per bath including tile, vanity, counter top, mirror, faucet, hot mop for shower (or tub if its a tub shower), shower plumbing fixtures, glass enclosure.Roof: $12,000 - Probably about right.Siding: $10,000 - Seems light to me and siding needs to be painted once installed.Paint: $9,000 - This is low considering you will have exterior paint as well.

2 February 2022 | 0 replies
LVP Flooring, Tiled both bathrooms, new paint throughout, granite countertops throughout, new carpet, new appliances, panted cabinets.What was the outcome?

12 February 2022 | 5 replies
If you are putting in mid-level finishes, such as laminate countertops, don't use a comp with high-end finishes such as quartz countertops.Step 5 - What you choose as your target acquisition cost formula depends on your and your business model and is not an industry standard.

2 February 2022 | 0 replies
Beautiful kitchen with quarts counter-top and center island, very popular exotic tigerwood hardwood flooring.

3 February 2022 | 2 replies
LVP flooring, laminate bathroom countertops/sinks, Amazon for lighting, Home Depot for faucets, toilets, and bath.

3 February 2022 | 0 replies
The cabinet/vanity area in one of the bathrooms and the kitchen countertops need to be replaced.

3 February 2022 | 0 replies
I will place lot on LLC before beginning construction.Yes😀 I can build them for $200k-husband will do countertops, trim, tile, cabinetry and other stuff.Should I not finished, I have other reserves I can use.

10 May 2021 | 0 replies
Full gut/rehab (3/2 SFR) 2020 2021 April Multiplier Materials* Materials % of job Multiplier Labor $ Increase 01: Plans / Permits Plans / Permits $ 5,000 $ 5,500 10% 0% 10% $ 500 02: Demolition $ 5,000 $ 5,500 10% 0% 10% $ 500 03: Foundation $ 20,000 $ 22,000 10% 50% 10% $ 2,000 04: Roof / Gutters $ 17,000 $ 18,870 12% 50% 10% $ 1,870 05a: Exterior Paint Exterior Paint $ 7,000 $ 7,700 10% 50% 10% $ 700 05b: Siding $ 5,000 $ 5,500 10% 50% 10% $ 500 06: Windows $ 5,000 $ 5,500 10% 50% 10% $ 500 07: Garage $ 5,000 $ 5,500 10% 50% 10% $ 500 07b: Driveway $ 5,000 $ 5,500 10% 50% 10% $ 500 08: Framing $ 5,000 $ 9,500 170% 50% 10% $ 4,500 09: Finish Carpentry $ 5,000 $ 9,500 170% 50% 10% $ 4,500 10: Sheetrock / Insulation $ 20,000 $ 22,000 10% 50% 10% $ 2,000 11: Interior Paint Interior Paint $ 7,000 $ 7,700 10% 50% 10% $ 700 12a: Flooring (laminate) Flooring (laminate) $ 5,000 $ 5,500 10% 50% 10% $ 500 12b: Flooring (carpet) Flooring (carpet) $ 5,000 $ 5,500 10% 50% 10% $ 500 13: Kitchen All new cabs & countertops $ 7,000 $ 9,940 170% 20% 10% $ 2,940 14: Bathroom $ 5,000 $ 5,500 10% 50% 10% $ 500 15a: Plumbing Rough $ 7,000 $ 7,700 10% 50% 10% $ 700 15b: Plumbing Final Fixtures, water heater, garbage disposal, dishwasher $ 2,500 $ 2,750 10% 50% 10% $ 250 16a: Electrical Rough $ 7,000 $ 8,400 30% 50% 10% $ 1,400 16b: Electrical Final Fixtures $ 2,500 $ 3,000 30% 50% 10% $ 500 17: HVAC Work $ 5,000 $ 5,500 10% 50% 10% $ 500 18: Appliances Range, Garbage disposal, dishwasher $ 4,000 $ 4,400 10% 0% 10% $ 400 19a: Yard Cleanup $ 2,000 $ 2,200 10% 50% 10% $ 200 19b: Fence $ 5,000 $ 9,500 170% 50% 10% $ 4,500 20: Basement / Crawlspace Vapor barrier $ 3,000 $ 3,300 10% 50% 10% $ 300 Contingency Stuff happens $ 5,000 $ 5,500 10% 50% 10% $ 500 trash haul Final trash load $ 500 $ 550 10% 0% 10% $ 50 mow lawn $ 500 $ 550 10% 0% 10% $ 50 Staging $ 3,000 $ 3,300 10% 0% 10% $ 300 $ 180,000 $ 213,360 $ 33,360 16% Does this make sense?

14 May 2021 | 5 replies
However, after speaking with a couple agents who represented nearby listings, my understanding is the home could fetch a $215-220k ARV as a flip (would require stainless steel appliances, granite countertops, custom finishes, etc.).