5 March 2014 | 4 replies
Same with kitchen cabinets, drywall, carpet, flooring, etc.

7 March 2014 | 11 replies
I fear if I hire out the work to start with and live there I may get in the way of the contractors and often times I will be inconvenienced with no kitchen, water, electric or whatever.

8 March 2014 | 4 replies
Although, I don't really rent to recent college graduates.The kitchen is kind of dated so it doesn't really appeal to women and their families where the wife makes the decision so I don't know if the whole school thing would be a factor.

10 March 2014 | 19 replies
They have calculators like a rehabber both 'top down and bottoms up" where they may create a bottoms up calculation like: 30 square roof with decking, insulation, paint, GC fees, new electrical, for a kitchen fire * depreciation, if applicable Or a top-down estimate: If kitchen construction costs in the area are $200, then the may estimate, e.g. $200 per foot and you have 400 ft damaged = 400 x $200 = $80,000 * depreciation if applicable Some states, you get paid the policy limits even if they are higher than the replacement cost.

8 March 2014 | 10 replies
So the entire kitchen needs to be ripped out cause it swelled to the middle of the kitchen.

7 March 2014 | 1 reply
It includes 2 BR 1BA, a 90% complete kitchen, large greatroom, and would require a separate HVAC (it is ducted and connected to the upstairs unit) separate water, and separate power.

7 March 2014 | 13 replies
We got everything done in the timeline we proposed and they were pretty happy.Same thing with a kitchen.

7 March 2014 | 8 replies
We are also upgrading the kitchen, painting, installing new flooring, and new fixtures to bring in better renters.

8 March 2014 | 6 replies
Carpet/stoves in 2009. 4th unit got new w/d in 2010. 2 units got new flooring in kitchen in 2010.

11 March 2014 | 12 replies
Still needed is some finishing touches, the light fixtures, equipment installation (kitchens, baths are there, just not installed yet).