Leland S.
East Nash Flip, looking for discount material vendors
26 September 2018 | 3 replies
.- Potential space to move laundry into upstairs bathroom closet vs basement - Can maybe get away with toilet/vanity replacement in each bathroom- Uncertain if painting or replacing cabinets with ikea type is worth it- Any in-ceiling lighting will cause a disaster with electrical since it is out of date- Repave/fix concrete front porch and side porch - replace/paint railing- Replace front walkway cement, or remove walkway and replace with right angled walk to driveway (may not provide ROI)- Tear down vs paint garage port in back yard
Leland S.
Fix n Flip options for best ROI, cheap n quick or rehab?
1 October 2018 | 2 replies
id=1IaAr5B1WeT...Cleanup Job (Low cost fast flip): landscape package in front remove deckremove vines from house clean exterior, fix siding and wood rot, paint neutral beige/gray color clean driveway/weed, clean retaining wall/pavement replace flooring with mid grade flooring bottom level, carpet upstairs replace interior fixtures paint interior white trim, light color beige/gray walls, popcorn ceiling removal new kitchen appliancesRehab options: Replace deck with new one (kind of awkward that high to me) vs Remove and fill in wall or add large window to master.Potential space to move laundry into upstairs bathroom closet vs basement Can maybe get away with toilet/vanity replacement in each bathroomUncertain if painting or replacing cabinets with ikea type is worth itAny in-ceiling lighting will open up codes stuff with electrical since it is out of dateRepave/fix concrete front porch and side porch - replace/paint railingReplace front walkway cement, or remove walkway and replace with right angled walk to driveway (may not provide ROI)Tear down vs paint garage port in back yardWhich do you think provides highest ROI?
Sara Dunn
Collecting Repair Costs from Tenant DURING a Lease
26 September 2018 | 1 reply
It was her fault (although accidental) & it needed immediate repair to prevent further damage from occurring (ie, pipe broken by shoving a metal storage rack into the sink cabinet).
Kathryn Stevens
Do you incentivize GCs? If so, how?
31 October 2018 | 26 replies
For example: If the contractor puts cabinets in, in the finish selected by the owner/investor and then the investor turns around after seeing the final product and says the finish isn't what they want now, well tough luck buddy, you chose it, you approved it, you own it.
Robert Dickinson
Cedar City, UT Looking For a Start
27 September 2018 | 6 replies
My friend is currently a plumber and has the ability to do anything from create custom cabinets to building a deck from scratch, and everything in between.
Joon Ma
Planning for a kitchen remodel that will most likely take longer
27 September 2018 | 0 replies
In addition, we were living with a legacy refrigerator barely bigger than a dorm fridge, and in the last weeks of our renovation, we asked the contractor to remove some cabinets, redo a wall and install a bigger fridge.
Gary Lawson
Trying to Figuring out the BRRRR Formula
3 October 2018 | 8 replies
For example, the deal we are working on right now we are replacing nearly everything (flooring, Air Conditioner, Electrical, Plumbing, windows, drywall, kitchen cabinets, full bathroom & the room has 20 years left).
Jeremy England
Triplex appraisal value
28 June 2018 | 0 replies
The market rental rate for the units (after repair) is 625/mo, this coming from another building across the street with equal sized, clean, painted, with newer cabinets The tax assessed value is 72000.Unsure of repairs needed yet but if I guestimate 12/sf i'm looking at about 25000 (I'll verify this before bidding)Comparable sales do not reflect much due to the number of sfh surrounding the property.
Dare Lamberson
Friend needs advice on selling
1 July 2018 | 7 replies
Once we started cleaning up the area I noticed that the area under the cabinets also has mold.
Arvin K.
Need advice: FHA 203k loan or get home improvement loan later
2 July 2018 | 1 reply
List of items to be done - (inspection next weekend)HVACAir Conditioner addition to current forced air furnaceElectricalGarage door motor to 1 car garage door Install recessed lights in living room, and new light fixtures in bedrooms, living rooms, kitchenReplace light switches/outlets to square plastic whiteFlooringRemove carpet, tack boards one main floor and top floorInstall vinyl plank flooring throughout main floor Same baseboardPaintingPaint all wood trim whitePaint kitchen cabinets whitePaint all wallsStructuralRemove half of kitchen wallSliding door for half bath on main floorKitchenReplace kitchen counter top, and match bathroom vanities with sameReplace kitchen sinkReplace appliances with stainless steelBathrooms Replace countertops with same kitchen counter materialGeneral workInstall window blinds on all windows