
21 February 2025 | 9 replies
If I want to do buy and hold rental first or a BRRRR or Fix and Flip?

12 February 2025 | 19 replies
I was looking for cash buyers, fix and flippers along with buy and hold people.

24 January 2025 | 12 replies
PS is revolutionary because of how it has simplified access to all of the various data points investors need to make a decision and because of this its extremely popular.You do not want to be using a popular lead source to increase deals because everyones chasing the same deals.And nothing will change with there data because there business model forces them to have to buy and license the data they get which means waiting for the county/databroker to send it to them which guarantees anyone using PS data will be behind the counties, only getting a fraction of the leads and getting those late leads the same time as everyone else.How do you get access to the leads first.

7 February 2025 | 2 replies
The previous owner started to repair it.Looks a little rough, but we’ll get her all fixed up.

16 January 2025 | 18 replies
Brandon is great, his business model though isnt for everyone.

23 January 2025 | 5 replies
Paint rags and paint plastic $386.66 Initial 70% deposit Cabinets $13,029.02 Backer board, Fiber rock, Shower drains, Zinc backer board screws $385.71 Junk Removal $600.00 red gard ($123.10) Initial 50% deposit Windows $10,493.20 2x4 studs $52.33 Junk Removal $400.00 Flooring sample $6.01 Flooring sample $68.48 Flooring sample $62.62 Flooring sample $132.09 Paint samples for accent wall $38.34 10% Draw for Master bathroom demo $580.00 Wall and shower Tile+Grout-Guest bath $528.62 LVP Flooring $7,165.27 Demo Work $1,275.00 LVP Flooring $7,198.07 Floor tile-Guest bath $889.05 50% down for moisture barrier and animal extraction $2,541.30 Returning flooring samples ($263.19) Paint-2 5gallon buckets SW $382.38 Unsure on what these are $19.54 Unsure on what these are $48.00 Master shower floor tile $331.42 Paint $3,100.00 Flooring underlayment $888.42 Primer $178.71 Paint-5 1gallon buckets SW $180.26 Paint $3,100.00 Appliances $6,820.59 Master bath tub $986.76 Paint-1 5gallon buckets SW $194.81 Primer $268.54 Framing repair for rotted wood $1,000.00 Junk Removal $500.00 Floor tile-Guest bath $771.07 Floor and Shower wall tile-Master $4,559.43 Stair noses $334.20 Master shower floor tile $612.76 Farmhouse sink $385.91 Master ceiling paint $254.29 Drywall repair in kitchen ceiling $500.00 Childrens wall tile and floor tile $3,477.40 Master shower floor tile-Return ($331.43) Drop in sinks for children's bathroom $103.75 Drop in sinks for upstairs bathroom $51.87 Master sinks $147.64 Master floor tile $270.05 Electricity $169.70 16x cement backer board return ($139.60) Tub and shower faucets $414.96 4 x Toilet seats $788.22 Tile install materials for all bathrooms $863.00 Air filters $10.90 Gas pipe and AC tune up+Duct repair $1,216.00 Tile install materials for all bathrooms $984.78 Roll of insulation X2 $38.48 Primer refund $125.33 Shower faucets X2 $480.71 Water $11.41 Master shower floor tile-Return the original white one ($261.55) Demo and materials he bought $1,005.14 Pickup charge for picking up flooring $223.96 Flooring 1st payment $4,000.00 Flooring return-guest bathroom tile ($889.05) Red guard refund $71.34 Backer board, wall tile and floor tile upstairs master return ($134.34) Keys X3 $10.93 Remaining balance for moisture barrier $2,046.30 Subfloor repair $100.00 Flooring $9,900.64 Master tub filler faucet $311.35 Tile labor in all bathrooms $9,202.22 Stair treads and risers $1,160.76 Bathroom painting $2,000.00 Junk Removal $150.00 Return for stair noses ($334.20) Return for flooring ($13,488.73) Flooring $1,900.00 Flooring underlayment $899.35 Trim $1,053.17 Toilet supply lines $13.46 Tile sealer, garage epoxy, garbage disposal $313.00 Return for remaining balance ($1,098.57) Floor reducer $49.99 Garage door opener $267.66 Door hardware (Hinges and door handles) $451.14 Counter tops $5,287.01 Tile return ($981.43) Tile return ($685.14) Tile return ($385.53) Tile return ($153.19) Tile return ($613.13) Flooring $1,900.00 Plumbing and electrical work (Light fix, toilets, drains) $975.00 Light fixtures and faucets $975.49 Junk Removal $125.00 Baseboards $241.45 Switches, outlets, faceplates $234.53 Cabinet balance $5,583.86 Sink return ($155.62) Dining room light and 4 ceiling fans $923.70 Anti skid additive for garage floor $11.38 Flooring $1,900.00 Glidden gel paint $24.01 Paint refund ($1,046.40) Counter tops $2,304.23 Extension rods for ceiling fans $40.64 3 Ceiling fans (one was returned) $573.93 Return grills $100.11 Kitchen and nook light fixtures $283.80 Rod for curtains and toilet paper holder $84.10 Curtain rods $54.60 Garage door deposit $1,185.00 Cleaning $400.00 Water heater $756.18 Thermostat $181.41 Stump Removal $300.00 Dryer cord $28.53 Plumbing and electrical work (Light fix, toilets, drains) $3,525.00 Junk Removal $125.00 Grass seed $71.40 Return of shipping cost ($297.45) Duct cleaning $970.00 Drains for master $46.54 Sold Fridge ($200.00) Bathroom fans $91.92 Samples for brick $29.98 Peg board hooks $20.83 Wall plate covers $21.28 Steel pegboards $140.72 Return stair tread and Riser ($198.14) Pressure washing $1,216.00 Wall plate covers $8.11 Shower door for upstairs $729.83 Powder room counter top $702.99 Light bulbs $59.24 Shower door deposit $1,000.00 Staple gun, staples, supply lines $157.04 Bathtowel hanging hardware $130.89 Light bulbs $29.62 GFCIs, underlayment, downrods ($233.54) Sanding pads $59.10 Yard hanging tools $21.94 Supply line return ($13.12) Stair clips and balusters $779.58 Returned some bathroom tile ($109.05) Peg board hooks $120.04 Front door $3,235.01 Brick sealer $50.81 Bathroom fan light and peg board hooks $71.27 Sanding pads, sanding sheets, etc $38.48 Mirrors $65.84 Mirrors $291.88 Spray bottle for marble sealer $4.34 Brick backsplash $695.54 Sanding pads $2.20 Shelves and shelf brackets for storage room $73.14 Shower door balance $1,000.00 Mirrors $104.26 Returned mirrors ($89.50) Gutters $2,043.15 Floors for finishing room $373.78 Wall plate covers $8.07 Floetrel and hood vent $31.49 Plumbing and electrical work $175.00 Backsplash and fireplace $2,450.00 Trim paint $50.21 Tile for master finish $15.17 Returned something.

28 January 2025 | 11 replies
The fix-up and increased value will not matter to the IRS as long as you sell within a reasonable time frame of the house passing into the estate.

27 February 2025 | 27 replies
There are many strategies, BRRRR, subto, seller finance, fix and flip, live and flip, and land splitting are just a few off the top of my head.

23 January 2025 | 9 replies
I don't yet have an estimate on cost.I've never used insurance for something like this because A) I've never had an expensive repair and B) I fix most stuff myself on my Denver units.Question is: Should I file a claim or will the insurance company raise my rates so much that it makes it not worth it.

9 February 2025 | 32 replies
Took them two days to fix and meanwhile I had to manually filter.