
8 March 2017 | 2 replies
The living room and dining room are connected by a partial wall with a large opening.

8 March 2017 | 5 replies
Some walls are stucco so need patching where has came off, flooring put down in addition (still plywood on floor), etc.Thanks for reading my long story!

11 March 2017 | 6 replies
Finally, I am considering adding wi-fi and front desk and somehow section off or partition spaces, either with drywall or pre fab removable walls for offices.

12 September 2017 | 22 replies
We have had the interior of those areas completely gutted (floors, walls, ceilings) and are waiting to start repairs.

11 March 2017 | 10 replies
There needs to be a full understanding of how the brick works within the "wall system".

15 March 2017 | 13 replies
ANY conventional loan with less than 80% LTV WILL incur PMI.Sadly, we use to be able to shed this when our equity was > 20%, but today, most if not all loans with PMI will retain it until the loan is refinanced or sold.

9 March 2017 | 4 replies
Even the affordable ones will likely ask you for a decent retainer (anywhere from $2500 to $5000).I'm not sure how the mediation program works in your county.

13 March 2017 | 7 replies
There is no way to cut a window as the next building wall is touching the siding of my property.

23 March 2017 | 5 replies
They also likely have 2x2's for the interior wall as many of the "temporary" housing in Oak Ridge did originally.

21 March 2017 | 27 replies
@Jason HirkoYeah whatever works or do a lighter rehab and don't open up the ceilings/subfloors/walls if not totally necessary.