Skip to content
×
PRO
Pro Members Get Full Access!
Get off the sidelines and take action in real estate investing with BiggerPockets Pro. Our comprehensive suite of tools and resources minimize mistakes, support informed decisions, and propel you to success.
Advanced networking features
Market and Deal Finder tools
Property analysis calculators
Landlord Command Center
$0
TODAY
$69.00/month when billed monthly.
$32.50/month when billed annually.
7 day free trial. Cancel anytime
Already a Pro Member? Sign in here
Pick markets, find deals, analyze and manage properties. Try BiggerPockets PRO.
x
Results (10,000+)
Carlos Pelegrina left int the cold by a GC
4 August 2019 | 3 replies
The time specified in the contract was never respected, not the construction set I sent, but the results were going OK, and I was dealing with it, trying to finish.Suddenly The guy disappeared, He didn't reply any or my emails text or calls, even I was following through pictures, some things he said were done, are in reality not done.By mistake the kitchen cabinets and backslash were removed when the construction plans I sent was specified just to paint them, and I'm thinking they probably demolished it by mistake adding a big expense. 
Karen F. Selling/renting office/residential Southington on N Main St
10 October 2018 | 1 reply
The office unit is currently 1700 sq ft of built out medical office space.  5 exam rooms, all with sinks and cabinets, two nursing stations, with sinks and cabinets, waiting room, administrative/check in area, large provider's office, large handicapped bathroom, handicapped ramp, plus a very large room with half bath on the second floor, that could be used as administrative space, or office space or staff break room. 
Jimmy Lin Advice on tenant proofing for low income properties
11 October 2018 | 3 replies
It will most likely be laminate counter tops, pre-fab cabinets, etc.  
Logan Freeman Looking for Architecture Firm
9 October 2018 | 1 reply
We need the below:Site plan- Floor plans, exterior elevations, preliminary structural design, building sections, preliminary cabinet layout andelevations, preliminary interior elevations- -dimensional exterior and/or interior renderings depicting the proposed work.
Charles Oglesby What to do about a smoking tenant after she leaves...
12 October 2018 | 6 replies
I used a TSP solution to scrub the walls and cabinets in the kitchen.
Frank Wolter How I went from 0-122 units mortgage free. My tips and secrets
8 November 2018 | 100 replies
Id be hanging new kitchen cabinets or installing floors.
Account Closed Lease renewal for an inherited tenant
11 October 2018 | 6 replies
We finally gave a 30 day notice to that remaining tenant & after a new kitchen of used cabinets, a new $100 tub (she cracked the cheap original) we got an extra $275/month.
Jon H. Newbie Columbus, Ohio - Minimal Experience, Desire to Wholesale
13 October 2018 | 13 replies
On the side, for the past 12+ years, I've been a hammer-swinger for the two residences I own, doing literally everything except roofing (yep, everything, including plumbing, electrical, ductwork, flooring, demolition, framing, drywall, brick-laying, windows, cabinets...... etc).
Jonathan Woodruff Is my mansion listed way too low?
13 October 2018 | 20 replies
It's actually well supported and the cabinets don't stay that narrow the whole length.
Kurt Michaelson [Calc Review] Help me analyze this deal
13 October 2018 | 2 replies
I have entered estimates for repairs and will possibly begin an offer at $105K.Here is a link to the Google photo album of the interior of the house - https://photos.app.goo.gl/mMoCL5Erq4hcqAdP9The figure for Plumbing is for each bathroom (2 1/2) as a full remodel.The figure for Doors includes reframing with lumber and doors throughout the house and windows, which also includes drywall, mud and other appropriate items.The figure for Cabinets/Countertops is for an entirely new kitchen with appliances.I appreciate your feedback.