
16 September 2015 | 10 replies
Leaking toilet with ceiling repair needed, another leaking toilet with sub floor repair needed, some new windows needed, new AC needed, a bunch of small electrical work, some roof issues due to ice dams that needs to be fixed, asphalt and garage foundation repair, gutters needed (none).

16 September 2015 | 3 replies
On our current flip we are doing all the work except electric, plumbing, and AC ourselves.- What you love & hate about it: love polishing a house that needs attention.

21 September 2015 | 10 replies
That included new piers under the raised floor, all new subfloor, new electric, new plumbing, clearing the 1/2 acre lot of piles of junk and trash, new windows, inside finishes done to today's standards and I added an entire bedroom on the back of the house. $35 grand.

17 September 2015 | 33 replies
The drywall is perfectly taped, floated and textured, but we need to get in there and check the electrical.

16 September 2015 | 4 replies
Its good to start and build up some capital but if you are going to be doing this full time you will want to develop relationships with contractors/electricians/plumbers.I usually do the big stuff my self electric/plumbing/hvac and leave the labor intensive stuff to others carpentry/drywall.

26 February 2016 | 4 replies
I did a five page report and 15 min power pint presentation on him for an interior design class last semester.

16 September 2015 | 8 replies
In my opinion, the Bay Area housing price won't jump up like the last couple of years (buyer maxed out their purchase power).

27 September 2015 | 10 replies
Is it customary in Wisconsin for the renter to pay electricity and water?

16 September 2015 | 5 replies
Located in Beaver County, UT6 miles West of Minersville, UT35 minutes NW of Cedar City, UTThere is power access across the streetLegal Description: W ½ of the NW ¼, N ½ of the NW ¼ of the SW ¼ S11 T30S R11W
25 October 2015 | 71 replies
That's how powerful the inflation/growth formula is.