
13 September 2014 | 12 replies
Hey guys,I have a lead on a property to wholesale (I'm brand new to wholesaling) I think I can get it at 70% of ARV but am worried that the work needed -- I don't know if it's ever been remodeled and has some water stains in the ceiling -- will be too much for a flipper to take on for the profit margin.

16 September 2014 | 9 replies
We could tell it had been doing it for years since the floor joists had water stains and some mold.

17 September 2014 | 13 replies
Stained wood door with some windows in it.

15 November 2013 | 2 replies
Having broken the stained glass panel of one door, they (the HOA committee!)

27 November 2013 | 13 replies
Not always, but look for signs of painting over water stains.

30 November 2013 | 16 replies
Typical 1/1, but in her bedroom I saw 2 spots she has a bucket collecting water leaks and the ceiling sheetrock is stained.

28 December 2013 | 51 replies
This will also include altering the side entrance.Paint/stain the exterior original cedar shake shingles (siding) and finish new siding design on the front porch.Lastly have insulation blown in the exterior walls.With this our home as well as the rest of the properties will be in great condition for the foreseeable future.

24 February 2014 | 26 replies
Having disclosures and having a judge care about them when you intentionally screw someone over that says they didn't understand all the paperwork are very different things.If they do that on a regular basis I assume they will go down hard the first time someone does get pissed off enough to see what they can do.These are definitely the sh*t stains of our industry that give everyone else a bad name.

7 May 2014 | 204 replies
We stained it about halfway between walnut and ebony.

9 December 2013 | 2 replies
Examples are:green water in poolbars on windowsno flooringno heat sourceevidence of leaksmolddry-rot or evidence of termitesfalling down fencesmissing doorsholes in wallswater stains on ceilings (requires roof cert)there's more...These are what a underwriter put as conditions on a conventional 4 unit approval I received today.9.