
12 October 2015 | 7 replies
I will be hiring out the installation of new electrical panels and water meters.Any thoughts?

24 November 2016 | 10 replies
For me, cost seg is the practice of pulling the personalty out of the purchase price - perfectly legal, becuase Im not doing the more complicated things of a comm'l study - such as how many feet of wire that run from the fixture to the panel are included in the 5 year property.

1 September 2017 | 10 replies
We put in a tankless H20 heater and upgraded to a 200amp panel out of necessity.

30 January 2018 | 22 replies
Plus solar panels all over the place and wind mills.

29 July 2013 | 16 replies
You should have gone up at least one panel length (4 feet ) up on the wall.

31 March 2018 | 39 replies
for gut rehabs, including plans and permits for moving interior walls to reconfigure floor plans, bringing everything up to code, rewiring and piping as needed, new panels, etc.

10 May 2016 | 10 replies
The walls are a similar story but since the drywall (not mold/mildew resistant) from a previous remodel was jenky, they just paneled right over it.

1 February 2016 | 10 replies
I tear a tab off the box with brand and model number and tacking it/hiding it behind access panels/under sink tacked up.

5 December 2017 | 16 replies
Doing 3 coats on 6 panel doors and louvered doors is time consuming.

21 March 2018 | 5 replies
When he applied for permit to separate electric panel, the city said it is a single family and gave him violation for the non-conforming unit.