![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3128262/small_1728924937-avatar-laurieannf.jpg?twic=v1/output=image&v=2)
1 November 2024 | 22 replies
Exterior maintenance such as pressure wash and gutter cleaning, these times we take care of them and usually at turnover.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2451349/small_1729663724-avatar-christiang238.jpg?twic=v1/output=image&v=2)
7 November 2024 | 30 replies
She realizes after we paid her and contractors she hired over $5,000 to get it painted , cleaned etc that we are out of money and she agreed to not charge us anymore but is still somewhat helping us and showing to potential renters .We have discussed different terms as I told her from her on out we can’t afford the monthly rate anymore .
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/989955/small_1621506951-avatar-philw28.jpg?twic=v1/output=image&v=2)
8 November 2024 | 47 replies
I use Resort Cleaning and it links perfectly to Hospitable to automate my cleaners.Ultimately though, all 3 platforms are excellent and will do what you need them to do.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1099874/small_1694575277-avatar-isaacs57.jpg?twic=v1/output=image&v=2)
12 November 2024 | 171 replies
2/3 of the units are singles/studios, so generally higher turnover, causing higher fees for clean outs and lease ups, etc, etcRecently had to get a "fire rated" door to the roof replaced from some city inspection, the first bids were $3800-$4500, but with the right contractors and a little of my own time and motivation, i got the job done for less than $1500 and 12 hours of my time, and it had 2x the fire rating than the city required.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/899660/small_1697102912-avatar-joeys30.jpg?twic=v1/output=image&v=2)
2 November 2024 | 6 replies
Make it clean, de-risk the exchange process and simply your costs for the exchange.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2696367/small_1712855967-avatar-cynthial93.jpg?twic=v1/output=image&v=2)
31 October 2024 | 4 replies
Client Name: Property Adddress: Current Property Type: Post Rehab Property Type: Level of Finishes: List Structural Changes: Final Bed/Bath Count: Exit Strategy (sell or refinance): PHASE 1: PRE-CONSTRUCTION Original Amount Net Adjustments Adjusted Total Description Drawings $ - $ - $ - Permits $ - $ - $ - Expeditor $ - $ - $ - Alarm/Security $ - $ - $ - Temporary Fencing $ - $ - $ - Portable Toilets $ - $ - $ - Engineering Fees $ - $ - $ - Architectural Fees $ - $ - $ - Utilities $ - $ - $ - TOTAL PRE-CONSTRUCTION $ - $ - $ - PHASE 2: DEMOLITION Original Amount Net Adjustments Adjusted Total Description Interior Demo Exterior Demo Dumpsters TOTAL DEMOLITION $ - $ - $ - PHASE 3: CORE AND SHELL Original Amount Net Adjustments Adjusted Total Description Excavation $ - $ - $ - Foundation $ - $ - $ - Underground Plumbing $ - $ - $ - Drain Tile $ - $ - $ - Sump Pump $ - $ - $ - Steel $ - $ - $ - Floor Joists $ - $ - $ - Subfloor $ - $ - $ - Rough Carpentry $ - $ - $ - Interior Stairs $ - $ - $ - Dormer $ - $ - $ - Roof Masonry Siding Windows Exterior Paint Soffit/Fascia Gutters Landscaping Walkways Exterior Doors $ - $ - $ - Exterior Stairs $ - $ - $ - Porch $ - $ - $ - Deck $ - $ - $ - Driveway $ - $ - $ - Garage TOTAL CORE AND SHELL $ - $ - $ - PHASE 4: HVAC Original Amount Net Adjustments Adjusted Total Description HVAC Rough Furnace Condensing Unit & Lineset $ - $ - $ - HVAC Trim $ - $ - $ - TOTAL HVAC $ - $ - $ - PHASE 5: ELECTRICAL Original Amount Net Adjustments Adjusted Total Description Electrical Rough $ - $ - $ - Electrical Finish & Fixtures Low Voltage TOTAL ELECTRICAL $ - $ - $ - PHASE 6: PLUMBING Original Amount Net Adjustments Adjusted Total Description Water Service Upgrade $ - $ - $ - Sewer $ - $ - $ - Plumbing Rough $ - $ - $ - Water Heater $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - TOTAL PLUMBING $ - $ - $ - PHASE 7: DRYWALL AND DOORS Original Amount Net Adjustments Adjusted Total Description Insulation $ - $ - $ - Drywall, Tape, Sand $ - $ - $ - Finish Carpentry (Trim) $ - $ - $ - Interior Doors $ - $ - $ - Interior Paint $ - $ - $ - TOTAL DRYWALL $ - $ - $ - PHASE 8: FLOORS Original Amount Net Adjustments Adjusted Total Description Hardwood Floors $ - $ - $ - Tile Vinyl Carpet $ - $ - $ - TOTAL FLOORS $ - $ - $ - PHASE 9: KITCHEN Original Amount Net Adjustments Adjusted Total Description Cabinets Countertops Backsplash Plumbing Fixtures $ - $ - $ - Light Fixtures Appliances TOTAL KITCHEN $ - $ - $ - PHASE 10: BATHROOMS Original Amount Net Adjustments Adjusted Total Description BATHROOM # 1 Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 1 $ - $ - $ - BATHROOM # 2 Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 2 $ - $ - $ - BATHROOM # 3 - Basement Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower $ - $ - $ - Tile $ - $ - $ - Vanity $ - $ - $ - Countertop $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 3 $ - $ - $ - **Please add itemization of work for additional kitchens or bathrooms** PHASE 11: OPTIONAL Original Amount Net Adjustments Adjusted Total Description Other $ - $ - $ - Fireplace $ - $ - $ - Final Cleaning Staging Stucco Closets General Contractor Fee $ - $ - $ - Finish Carpentry $ - $ - $ - Underpinning $ - $ - $ - Footers $ - $ - $ - Contingency $ - $ - $ - TOTAL OPTIONAL $ - $ - $ - Total Estimated Cost of Repairs $ - $ - $ -
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3052597/small_1718650214-avatar-williamh807.jpg?twic=v1/output=image&v=2)
5 November 2024 | 22 replies
Cleaning carpet and paitning is all that is needed.btw.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2173842/small_1670772505-avatar-prettyk.jpg?twic=v1/output=image&v=2)
1 November 2024 | 22 replies
But get an LLC and rent from it personally...any cleaning expenses, paying your mortgage etc. come from the LLC's bank account, any outside money that you need to fund the account will be a capital contribution and then you will be able to do cost seg on that property.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2528134/small_1661270332-avatar-whitneym55.jpg?twic=v1/output=image&v=2)
31 October 2024 | 1 reply
I would have hired a junk haul person to do the clean out instead of my contractor.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/724776/small_1621496151-avatar-ryanm261.jpg?twic=v1/output=image&v=2)
1 November 2024 | 2 replies
We added a mini split system, new floors throughout, rebuilt the deck, added windows, repaired waste lines, roof, siding, stucco, cleaned up the basement and remodeled the kitchen and bathrooms.