Skip to content
×
Try PRO Free Today!
BiggerPockets Pro offers you a comprehensive suite of tools and resources
Market and Deal Finder Tools
Deal Analysis Calculators
Property Management Software
Exclusive discounts to Home Depot, RentRedi, and more
$0
7 days free
$828/yr or $69/mo when billed monthly.
$390/yr or $32.5/mo when billed annually.
7 days free. Cancel anytime.
Already a Pro Member? Sign in here
Pick markets, find deals, analyze and manage properties. Try BiggerPockets PRO.
x
Results (6,026+)
Donny Random roof leak
11 March 2008 | 4 replies
That often means not "dubbing" and cementing valleys correctly, and half a**ing the ridge.Remember that where the leak shows up in the attic is often a bit downstream from where the water is entering on the roof.As a friend of mine (roofer) used to say; "I guarantee I can fix your leak!
George Batton laying down sticky tiles?
5 January 2008 | 5 replies
This will level the floor, if its not to bad.Next you will want to use a cement board or tile "backer" board to go down prior to the tile.
Brian Stein A property good for rehab but not for rent?
22 January 2008 | 3 replies
The counter tops are scratched and stained, old painted cubboards, old windows the upstairs bedrooms floors are painted and I have cheap carpet down stairs.
Jimmy NA Anti-slip tape or Vinyl Treads?
26 February 2008 | 0 replies
Which is the better option for the interior stairs of my three family?
Jimmy NA Anti-Slip tape or Vinyl Treads?
27 February 2008 | 3 replies
Which is the better option for the interior stairs of my three family?
Kim VanLandingham Don't like to think of myself as a "complete" newb
28 February 2008 | 6 replies
I have worked with contractors for the new cement work, garage and roof.Now that my home is complete and the girls are older I am getting bored again.
Gash Nag Carpet replacement for Townhome
20 September 2011 | 9 replies
I have quad 4 unit buildings that are town homes.What I have found is it is much better to put all tile on the main floor instead of carpet or vinyl.Upstairs with the carpet it doesn't get worn down as much as the main level.When you evict a tenant with tile it is mop and go and not fixing tears in vinyl or carpet that can't be salvaged.The dirty carpets tend to attract bug problems as well.You can find tile cheap and buy a big area rug to warm it up for cheap.The key with tile is the contractors can kill you on the install fee.You have to find a contractor hungry for money.I can get tile 12 X 12 for 56 cents a sq ft.Main level I would spend about 229.60 in tiles,another 150.00 in mix for bonding and grout for finish and just put back old finish trim down and repaint.Can get a hungry contractor for 75.00 a day to tile day one and finish grout 75.00 day two.Total cost 529.60 for main level.I have 1,178 sq ft with 2 story but I leave carpet upstairs and on the stairs and tile the main.Don't pay high prices.Be patient and turn over rocks to find the great deals.
Phil Tsouridis Rehab Question - What to offer & how much to fix?
1 November 2011 | 12 replies
I am trying to figure on costs of rehab as well as what to offer on home - ( I would reside in Home there after as owner occupant ) it needs the following from what i can see.. x2 for two floors/ apts- 43 replacement windows- 43 Square of Roof- a Rather Large Tree Limbs Hanging over roof cut- 4 Exterior Doors with storm doors- 6 Exterior doors with no storm doors- Raise Porch Rails to code ( another ft or so ) Porch in front is 50 ft & rear Porches 30 ft- Fix Front wooden stairs @ 5-6 ft wide- Fix Water entering basement thru Bull Ked ( add a drain or pour concrete )- Pour Concrete in Three car garage floor ( is dirt now )- Needs Heating & Hot water, and baseboard heat up two floors ( two new furnaces and FHW baseboard brought up two stories )- Electrical service upgrade from 60 amps old knob and tub to breakers and also bring up two floors adding new elec service in whole building adding plugs in all rooms plus washer and dryer hookups - 2 Panels, and move it to outside from basement..- New sub floors in Kitchens where needed , and then Linoleum floors in kitchen- Total Cleanout 3-4 Roll Off Dumpsters for left behind junk- Linoleum in pantry 4x8- 2 Bathrooms - Needs new linoleum and 1 needs Sub floor- Bathroom walls - rip off old plastic tile in one and make drywall and paint - Ba 2 Needs Rip off wall paper and skim and paint2 - Living room Kitchen & (2) Dining Room and 3 (6)Bed rooms Refinish Hardwood floors on ea floor so x22- Living rooms, kitchen and dining rooms, remove wall paper and skim coat, and paint all walls and ceilings2 - Living Rooms and windows remove all trim and replace with new and paint ( lead Paint )2 - Repair Bathroom Ceilings and Pantry Ceilings and then paint6 Bedrooms Fix Drywall, paint walls and ceilings2 Bathrooms install bathtub wall panels2 - Install Kitchen Cabinets , and countertops, and Sink in both pantrys2- Install Dishwashers including pipe, drains and elec in two pantries2 - Over stove - More cabinets in Kitchen @ 6 ft top and bottom with countertops2 Install washer and dryer hookups after bringing power to locationApprox 150-200 ft of Asbestos removal in basementalso what is the lead time to do all this..?
Don Hines Boo Boos
25 March 2012 | 10 replies
Used the remnants of an old can of pvc pipe cement instead of buying a new can- had to redo some plumbing.A few years ago I broke my own toilet by forgetting a hammer on the counter.
Bienes Raices Do you have the power on when you wholesale the property?
10 July 2015 | 16 replies
They could have pipes clogged by cement, AC that does not operate, or any other number of issues that can be hidden with utilities turned off.