Marc Shin
closet has some round foam structure
14 November 2024 | 4 replies
Typically these need now to be in a rated shaft and just not insulated.
Jay Hinrichs
How U.S. can lower housing prices? And Could Trump look at Broker model as Broken?
20 November 2024 | 45 replies
Just a side note.. houses in Cupertino that were built in the 50s and 60s many times had NO insulation they just put in two furnaces :) And as you noted they sold for 15 to 25k.. in those days I still remember late 60s when they were crawling up to the 50k mark..
Leland S.
Retrofit sound insulation between levels
31 October 2024 | 4 replies
After some research, I've come up with the following:- Blown-in insulation to fill the joists with hard-packed cellulose- Add asphalt panel board layer across the entire ceiling to the existing drywall and fill the cutouts. - Add a second layer of 5/8's drywall to the asphalt board.
Sima Meh
Should I buy a property with mice problem and likely mold in the basement?
5 November 2024 | 11 replies
(Tunnel holes in insulation and droppings).
Orlando Kell
What is proper order of rehab work?
11 November 2024 | 36 replies
Then insulation, then drywall, then paint primer.
Paul B.
Nevada LLC and privacy
8 November 2024 | 6 replies
I am not currently using a property manager, so any other extra insulating layer that I can get is useful to me.
Cynthia Leite
Scope of work (SOW)
31 October 2024 | 4 replies
Client Name: Property Adddress: Current Property Type: Post Rehab Property Type: Level of Finishes: List Structural Changes: Final Bed/Bath Count: Exit Strategy (sell or refinance): PHASE 1: PRE-CONSTRUCTION Original Amount Net Adjustments Adjusted Total Description Drawings $ - $ - $ - Permits $ - $ - $ - Expeditor $ - $ - $ - Alarm/Security $ - $ - $ - Temporary Fencing $ - $ - $ - Portable Toilets $ - $ - $ - Engineering Fees $ - $ - $ - Architectural Fees $ - $ - $ - Utilities $ - $ - $ - TOTAL PRE-CONSTRUCTION $ - $ - $ - PHASE 2: DEMOLITION Original Amount Net Adjustments Adjusted Total Description Interior Demo Exterior Demo Dumpsters TOTAL DEMOLITION $ - $ - $ - PHASE 3: CORE AND SHELL Original Amount Net Adjustments Adjusted Total Description Excavation $ - $ - $ - Foundation $ - $ - $ - Underground Plumbing $ - $ - $ - Drain Tile $ - $ - $ - Sump Pump $ - $ - $ - Steel $ - $ - $ - Floor Joists $ - $ - $ - Subfloor $ - $ - $ - Rough Carpentry $ - $ - $ - Interior Stairs $ - $ - $ - Dormer $ - $ - $ - Roof Masonry Siding Windows Exterior Paint Soffit/Fascia Gutters Landscaping Walkways Exterior Doors $ - $ - $ - Exterior Stairs $ - $ - $ - Porch $ - $ - $ - Deck $ - $ - $ - Driveway $ - $ - $ - Garage TOTAL CORE AND SHELL $ - $ - $ - PHASE 4: HVAC Original Amount Net Adjustments Adjusted Total Description HVAC Rough Furnace Condensing Unit & Lineset $ - $ - $ - HVAC Trim $ - $ - $ - TOTAL HVAC $ - $ - $ - PHASE 5: ELECTRICAL Original Amount Net Adjustments Adjusted Total Description Electrical Rough $ - $ - $ - Electrical Finish & Fixtures Low Voltage TOTAL ELECTRICAL $ - $ - $ - PHASE 6: PLUMBING Original Amount Net Adjustments Adjusted Total Description Water Service Upgrade $ - $ - $ - Sewer $ - $ - $ - Plumbing Rough $ - $ - $ - Water Heater $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - TOTAL PLUMBING $ - $ - $ - PHASE 7: DRYWALL AND DOORS Original Amount Net Adjustments Adjusted Total Description Insulation $ - $ - $ - Drywall, Tape, Sand $ - $ - $ - Finish Carpentry (Trim) $ - $ - $ - Interior Doors $ - $ - $ - Interior Paint $ - $ - $ - TOTAL DRYWALL $ - $ - $ - PHASE 8: FLOORS Original Amount Net Adjustments Adjusted Total Description Hardwood Floors $ - $ - $ - Tile Vinyl Carpet $ - $ - $ - TOTAL FLOORS $ - $ - $ - PHASE 9: KITCHEN Original Amount Net Adjustments Adjusted Total Description Cabinets Countertops Backsplash Plumbing Fixtures $ - $ - $ - Light Fixtures Appliances TOTAL KITCHEN $ - $ - $ - PHASE 10: BATHROOMS Original Amount Net Adjustments Adjusted Total Description BATHROOM # 1 Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 1 $ - $ - $ - BATHROOM # 2 Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 2 $ - $ - $ - BATHROOM # 3 - Basement Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower $ - $ - $ - Tile $ - $ - $ - Vanity $ - $ - $ - Countertop $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 3 $ - $ - $ - **Please add itemization of work for additional kitchens or bathrooms** PHASE 11: OPTIONAL Original Amount Net Adjustments Adjusted Total Description Other $ - $ - $ - Fireplace $ - $ - $ - Final Cleaning Staging Stucco Closets General Contractor Fee $ - $ - $ - Finish Carpentry $ - $ - $ - Underpinning $ - $ - $ - Footers $ - $ - $ - Contingency $ - $ - $ - TOTAL OPTIONAL $ - $ - $ - Total Estimated Cost of Repairs $ - $ - $ -
Raif Harris
Airbnb Vermont Cabins
6 November 2024 | 22 replies
Has anyone either upgraded their own cabin(s) or ran the numbers on the costs to improve a ~500 - 700 SF cabin with insulation, sheetrock and heat so they can be rented year round?
Dillan Gomez
Advice needed on results of my property inspection
1 November 2024 | 5 replies
It seems to be missing the wood flooring at the moment, but did get the insulation wet and there was a puddle of water under the pipe.