Kegan Scholl
Best market for first house hack to cash flow? FL, TX, AZ, UT, other?
20 January 2025 | 6 replies
Building a strong financial plan, researching markets, assembling a reliable team, and having an exit strategy are essential steps to success.Good luck!
Diandre Pierce
I have 5 houses renting, what's next
12 January 2025 | 8 replies
Dig deep into tax strategy, tax efficiency, etc Learn about estate planning.
Spencer Dixon
BF LIVE then LEAVE
16 January 2025 | 0 replies
It all started with removing some interior walls and changing the floor plan, removing a chimney, adding a bedroom and bathroom, installing patio door to the backyard, and completely renovating every other interior element What was the outcome?
Thomas Farrell
Long Overdue Introduction
11 January 2025 | 11 replies
I'm planning on buying a LTR at the moment, likely small multifamily. markets are hard too.
Byron Umana
How to Maximize Your Airbnb Income: Tips for New Hosts
26 January 2025 | 7 replies
The best thing you can do is plan that the first year will be on the lean side.
Aaron Costello
Finally Setting up my account
21 January 2025 | 7 replies
We have a decent plan working now, its just a matter of financing and scaling.
Logan Rhea
Thoughts if this property flip Scope of work is too low
23 January 2025 | 5 replies
., HVAC tune-up, plumbing fixes)Deep clean entire property pre-listingEstimated Cost: $5,000Total Estimated Renovation Cost: $145,000Project TimelineWeek 1-2: Planning and DemolitionFinalize design and materialsObtain necessary permitsBegin demolition (kitchen, bathrooms, floors)Week 3-5: Structural and Major InstallationsInstall new cabinets and countertops in kitchenComplete bathroom tiling and vanity installationRefinish or replace flooringWeek 6-7: Painting and FixturesPaint interior and exteriorInstall lighting, hardware, and plumbing fixturesWeek 8: Finishing TouchesLandscaping and curb appeal updatesDeep cleaning and stagingTotal Timeline: 8 Weeks*This link comes directly from our calculators, based on information input by the member who posted.
Don M.
First time with new construction: Cape Coral, FL
20 January 2025 | 204 replies
The longest delay is the floor plans.
Vidit Maini
Cracks Appearing in Condo – Normal wear and tear OR Structural Concern?
23 January 2025 | 9 replies
When i press on the cracked areas, it does not appear soft or wet.I plan to fix it, but I worry it may reappear in months.
Jaedon Stout
Looking for Real Estate Investment Strategies Using Funding
13 January 2025 | 5 replies
It all depends on the work you/your clients want to do to create value and the overall game plan.