Marc Shin
lower cost alternatives to Quartz / Granite countertops in an STR
5 November 2024 | 22 replies
I'd rather not spend the $$ for the granite or quartz kitchen countertops.
Jaime Ramirez
Rental Property taking too long to rent
14 November 2024 | 8 replies
The dishwasher should be to the right of the sink as a large majority of people are right handed.There is a picture of a second fridge in the kitchen, but no mention of it in the listing.You'd have been better off putting the stove where the second fridge is and giving the renter more countertop space.
Tyler Jahnke
Morris Invest Case Study 2.0
30 December 2024 | 819 replies
@Alan Grobmeier you will love this from your perspective.I bid on a 40 unit section 8 project in Hattisburg MS.. a few years back ( did not get it)but the builder was brilliant he built these for his style of tenant Block construction painted on the inside and out.. concrete floors... and industrial grade doors and hinges... floor sloped alittle to a main drain in the middle... concrete counter tops etc etc.so when tenant went out high pressure hose came in and cleaned it all out LOL.. you take little homes in the mid west that are lath and plaster or sheet rock with carpets and you will be spending a ton of money on turn over.my new construction I bought in MS were all stained concrete floors... only carpet in bed rooms.
Carlos Ptriawan
Don't become passive investors
1 December 2024 | 91 replies
this is why it's very tiring and boring, everyone of those offering they would paint everything with white colour, change the countertop, add stainless stell appliance, what else are there ?
Orlando Kell
What is proper order of rehab work?
11 November 2024 | 36 replies
Originally posted by @Chris Purcell:Originally posted by @Kevin Branin:exterior first(roofing, windows, entry and exit doors,siding, foundation), then fix electric and plumbing hvac. then hang int. doors drywall and spackle, then prime all walls, install floors, tile bath and kitchen, then cabinets, then countertop, then finish paint all walls, then finish electric and set toilets, faucets, hvac registers, etc, then hang trim and paint trim, then get paid for your hard work Install floors before painting walls?
Ori Skloot
Remodeling Cost for Small Apartment With Pics (Example)
15 November 2024 | 10 replies
.$900Microwave, Sink, faucet, sink hardware $600Quartz Countertop (one 10 foot slab)$300Electrical Materials: wire, receptacles, lights, etc..$400Baseboard (had it left over from another job so $0, but would have cost around $100)New interior door, wood studs, drywall, mud $300Paint $100Dump Fees $500Misc stuff I’m probably forgetting $500TOTAL COST $12,500Rehab cost per square foot = $25
Kristin Solbach
STR to LTR - is it possible?
14 November 2024 | 30 replies
New hvac, floors, paint, new counter tops.
Account Closed
Wholesale Investment in a Single-Family Residence
3 November 2024 | 0 replies
(optional)Kitchen Remodel (2020): Updated countertops, cabinets, and installed new stainless steel appliances.Bathroom Renovation (2019): Added new tiles, modern fixtures, and a glass shower enclosure in the master bathroom.Finished Basement (2018): Added 600 sq. ft. of finished space, including a family room and home office.New Roof (2021): Replaced the entire roof with new shingles and added improved insulation.Landscaping (2022): Redesigned front and backyard with new plants, sod, and an outdoor seating area.Energy-Efficient Windows (2020): Installed energy-saving windows throughout the home.
Cynthia Leite
Scope of work (SOW)
31 October 2024 | 4 replies
Client Name: Property Adddress: Current Property Type: Post Rehab Property Type: Level of Finishes: List Structural Changes: Final Bed/Bath Count: Exit Strategy (sell or refinance): PHASE 1: PRE-CONSTRUCTION Original Amount Net Adjustments Adjusted Total Description Drawings $ - $ - $ - Permits $ - $ - $ - Expeditor $ - $ - $ - Alarm/Security $ - $ - $ - Temporary Fencing $ - $ - $ - Portable Toilets $ - $ - $ - Engineering Fees $ - $ - $ - Architectural Fees $ - $ - $ - Utilities $ - $ - $ - TOTAL PRE-CONSTRUCTION $ - $ - $ - PHASE 2: DEMOLITION Original Amount Net Adjustments Adjusted Total Description Interior Demo Exterior Demo Dumpsters TOTAL DEMOLITION $ - $ - $ - PHASE 3: CORE AND SHELL Original Amount Net Adjustments Adjusted Total Description Excavation $ - $ - $ - Foundation $ - $ - $ - Underground Plumbing $ - $ - $ - Drain Tile $ - $ - $ - Sump Pump $ - $ - $ - Steel $ - $ - $ - Floor Joists $ - $ - $ - Subfloor $ - $ - $ - Rough Carpentry $ - $ - $ - Interior Stairs $ - $ - $ - Dormer $ - $ - $ - Roof Masonry Siding Windows Exterior Paint Soffit/Fascia Gutters Landscaping Walkways Exterior Doors $ - $ - $ - Exterior Stairs $ - $ - $ - Porch $ - $ - $ - Deck $ - $ - $ - Driveway $ - $ - $ - Garage TOTAL CORE AND SHELL $ - $ - $ - PHASE 4: HVAC Original Amount Net Adjustments Adjusted Total Description HVAC Rough Furnace Condensing Unit & Lineset $ - $ - $ - HVAC Trim $ - $ - $ - TOTAL HVAC $ - $ - $ - PHASE 5: ELECTRICAL Original Amount Net Adjustments Adjusted Total Description Electrical Rough $ - $ - $ - Electrical Finish & Fixtures Low Voltage TOTAL ELECTRICAL $ - $ - $ - PHASE 6: PLUMBING Original Amount Net Adjustments Adjusted Total Description Water Service Upgrade $ - $ - $ - Sewer $ - $ - $ - Plumbing Rough $ - $ - $ - Water Heater $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - TOTAL PLUMBING $ - $ - $ - PHASE 7: DRYWALL AND DOORS Original Amount Net Adjustments Adjusted Total Description Insulation $ - $ - $ - Drywall, Tape, Sand $ - $ - $ - Finish Carpentry (Trim) $ - $ - $ - Interior Doors $ - $ - $ - Interior Paint $ - $ - $ - TOTAL DRYWALL $ - $ - $ - PHASE 8: FLOORS Original Amount Net Adjustments Adjusted Total Description Hardwood Floors $ - $ - $ - Tile Vinyl Carpet $ - $ - $ - TOTAL FLOORS $ - $ - $ - PHASE 9: KITCHEN Original Amount Net Adjustments Adjusted Total Description Cabinets Countertops Backsplash Plumbing Fixtures $ - $ - $ - Light Fixtures Appliances TOTAL KITCHEN $ - $ - $ - PHASE 10: BATHROOMS Original Amount Net Adjustments Adjusted Total Description BATHROOM # 1 Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 1 $ - $ - $ - BATHROOM # 2 Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 2 $ - $ - $ - BATHROOM # 3 - Basement Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower $ - $ - $ - Tile $ - $ - $ - Vanity $ - $ - $ - Countertop $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 3 $ - $ - $ - **Please add itemization of work for additional kitchens or bathrooms** PHASE 11: OPTIONAL Original Amount Net Adjustments Adjusted Total Description Other $ - $ - $ - Fireplace $ - $ - $ - Final Cleaning Staging Stucco Closets General Contractor Fee $ - $ - $ - Finish Carpentry $ - $ - $ - Underpinning $ - $ - $ - Footers $ - $ - $ - Contingency $ - $ - $ - TOTAL OPTIONAL $ - $ - $ - Total Estimated Cost of Repairs $ - $ - $ -
Whitney McNair
I fix and flip properties to reinvest in syndications.
31 October 2024 | 1 reply
New kitchen, countertops, appliances, flooring, demo, new bathrooms, paint, etc.