
13 January 2024 | 3 replies
Whats the basis of the demo order?

14 October 2021 | 21 replies
How much is a rough estimate to demo an existing house to build new construction?

7 March 2023 | 5 replies
I'd estimate how much time it takes for 2-3 reasonably quick workers to complete the demo.

7 February 2023 | 9 replies
I realize that the VA reno loan will require contractors doing the big work, but you can still do some things like paint, possibly demo (depending on your contractor) and so on.

8 April 2019 | 1 reply
A seasoned flipper in Ft Worth told me that demo should cost around $.75 - $1.25 per square ft making the cost to knock out a 442 sq ft wood floor in the basement around $552.50 .

5 June 2022 | 3 replies
This led me to wonder if demo-ing the shed and putting an Airstream back there would be a good idea.

16 February 2020 | 5 replies
I’ve found a property that will need to be gutted down to its studs but as neither of my previous properties needed much demo, I’m having a hard time figuring out how much I should estimate for rehab.

19 January 2015 | 22 replies
Even at $250 per unit, if each unit takes a day to demo, we're talking $30 per hour.

1 February 2024 | 3 replies
I intend on demoing the property and potentially building out 6-8 units. 2.

31 January 2024 | 8 replies
I.e, all demo complete, rough MEP done, insultation & drywall, etc.A lot of contractors require a deposit or money upfront which is never the best idea, but to be honest we have to do this from time to time even with our subcontractors.