![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/758472/small_1673465729-avatar-jayh65.jpg?twic=v1/output=image&v=2)
7 November 2024 | 14 replies
Therefore anyone with bank originated construction debt or bridge debt is likely happy right now with the rate cut and narrative surrounding future cuts since in many cases these are adjustable rate loans with floors we likely won't see anytime soon.It will be interesting to see whether this cut gets banks who have been on the sidelines back into the market or alternatively some lenders who have continued to lend but with tighter underwriting to ease their guidelines.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2696367/small_1712855967-avatar-cynthial93.jpg?twic=v1/output=image&v=2)
31 October 2024 | 4 replies
Client Name: Property Adddress: Current Property Type: Post Rehab Property Type: Level of Finishes: List Structural Changes: Final Bed/Bath Count: Exit Strategy (sell or refinance): PHASE 1: PRE-CONSTRUCTION Original Amount Net Adjustments Adjusted Total Description Drawings $ - $ - $ - Permits $ - $ - $ - Expeditor $ - $ - $ - Alarm/Security $ - $ - $ - Temporary Fencing $ - $ - $ - Portable Toilets $ - $ - $ - Engineering Fees $ - $ - $ - Architectural Fees $ - $ - $ - Utilities $ - $ - $ - TOTAL PRE-CONSTRUCTION $ - $ - $ - PHASE 2: DEMOLITION Original Amount Net Adjustments Adjusted Total Description Interior Demo Exterior Demo Dumpsters TOTAL DEMOLITION $ - $ - $ - PHASE 3: CORE AND SHELL Original Amount Net Adjustments Adjusted Total Description Excavation $ - $ - $ - Foundation $ - $ - $ - Underground Plumbing $ - $ - $ - Drain Tile $ - $ - $ - Sump Pump $ - $ - $ - Steel $ - $ - $ - Floor Joists $ - $ - $ - Subfloor $ - $ - $ - Rough Carpentry $ - $ - $ - Interior Stairs $ - $ - $ - Dormer $ - $ - $ - Roof Masonry Siding Windows Exterior Paint Soffit/Fascia Gutters Landscaping Walkways Exterior Doors $ - $ - $ - Exterior Stairs $ - $ - $ - Porch $ - $ - $ - Deck $ - $ - $ - Driveway $ - $ - $ - Garage TOTAL CORE AND SHELL $ - $ - $ - PHASE 4: HVAC Original Amount Net Adjustments Adjusted Total Description HVAC Rough Furnace Condensing Unit & Lineset $ - $ - $ - HVAC Trim $ - $ - $ - TOTAL HVAC $ - $ - $ - PHASE 5: ELECTRICAL Original Amount Net Adjustments Adjusted Total Description Electrical Rough $ - $ - $ - Electrical Finish & Fixtures Low Voltage TOTAL ELECTRICAL $ - $ - $ - PHASE 6: PLUMBING Original Amount Net Adjustments Adjusted Total Description Water Service Upgrade $ - $ - $ - Sewer $ - $ - $ - Plumbing Rough $ - $ - $ - Water Heater $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - TOTAL PLUMBING $ - $ - $ - PHASE 7: DRYWALL AND DOORS Original Amount Net Adjustments Adjusted Total Description Insulation $ - $ - $ - Drywall, Tape, Sand $ - $ - $ - Finish Carpentry (Trim) $ - $ - $ - Interior Doors $ - $ - $ - Interior Paint $ - $ - $ - TOTAL DRYWALL $ - $ - $ - PHASE 8: FLOORS Original Amount Net Adjustments Adjusted Total Description Hardwood Floors $ - $ - $ - Tile Vinyl Carpet $ - $ - $ - TOTAL FLOORS $ - $ - $ - PHASE 9: KITCHEN Original Amount Net Adjustments Adjusted Total Description Cabinets Countertops Backsplash Plumbing Fixtures $ - $ - $ - Light Fixtures Appliances TOTAL KITCHEN $ - $ - $ - PHASE 10: BATHROOMS Original Amount Net Adjustments Adjusted Total Description BATHROOM # 1 Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 1 $ - $ - $ - BATHROOM # 2 Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 2 $ - $ - $ - BATHROOM # 3 - Basement Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower $ - $ - $ - Tile $ - $ - $ - Vanity $ - $ - $ - Countertop $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 3 $ - $ - $ - **Please add itemization of work for additional kitchens or bathrooms** PHASE 11: OPTIONAL Original Amount Net Adjustments Adjusted Total Description Other $ - $ - $ - Fireplace $ - $ - $ - Final Cleaning Staging Stucco Closets General Contractor Fee $ - $ - $ - Finish Carpentry $ - $ - $ - Underpinning $ - $ - $ - Footers $ - $ - $ - Contingency $ - $ - $ - TOTAL OPTIONAL $ - $ - $ - Total Estimated Cost of Repairs $ - $ - $ -
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3089055/small_1728050200-avatar-brandonweis.jpg?twic=v1/output=image&v=2)
2 November 2024 | 9 replies
Maybe consider a folding treadmill or adjustable dumbbell set?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2307992/small_1648777756-avatar-balarei.jpg?twic=v1/output=image&v=2)
7 November 2024 | 51 replies
We reviewed some of the past closures that were impressive.After almost 2 years, we aggreed for an adjusted reduced guaranteed payout and even that schedule was not honored.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3052597/small_1718650214-avatar-williamh807.jpg?twic=v1/output=image&v=2)
5 November 2024 | 22 replies
Signed some agreements where it looks like I should not talk about the case on public forums til it is done.He found some things and made adjustments for what appears to be an outcome in my favor.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2080434/small_1694569483-avatar-stevet231.jpg?twic=v1/output=image&v=2)
2 November 2024 | 20 replies
If rents increase faster, I MIGHT go up to 5% and I will adjust rents higher whenever there is a turnover.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1724134/small_1621515055-avatar-gtodrank.jpg?twic=v1/output=image&v=2)
31 October 2024 | 2 replies
Notably, we were able to work with local lawmakers to adjust a proposed bill that would've included STR's in an "empty home tax" that would've essentially made all the STR's on the island unprofitable.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/246472/small_1714846985-avatar-jec83b.jpg?twic=v1/output=image&v=2)
30 October 2024 | 3 replies
The column titled "m_nights_altered" in the Airbnb booking sheet typically indicates adjustments made to the original reservation.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2915939/small_1730844319-avatar-scottm994.jpg?twic=v1/output=image&v=2)
5 November 2024 | 34 replies
I would then adjust down the original MTR rental estimate based on those findings.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3018672/small_1715870879-avatar-ismaela26.jpg?twic=v1/output=image&v=2)
30 October 2024 | 7 replies
Because they have the leverage to adjust terms and show they could close another way.Basically, combining wholesalers and seller finance is a recipe for analysis paralysis.