Skip to content
×
Pro Members Get
Full Access!
Get off the sidelines and take action in real estate investing with BiggerPockets Pro. Our comprehensive suite of tools and resources minimize mistakes, support informed decisions, and propel you to success.
Advanced networking features
Market and Deal Finder tools
Property analysis calculators
Landlord Command Center
ANNUAL Save 54%
$32.50 /mo
$390 billed annualy
MONTHLY
$69 /mo
billed monthly
7 day free trial. Cancel anytime
Pick markets, find deals, analyze and manage properties. Try BiggerPockets PRO.
x
Results (7,140+)
Anssi Viljanen First personal residence with an interest only loan?
28 July 2017 | 16 replies
Rather than trimming expenses down, I refinanced into an interest only first and interest only second mortgage - I was told the price of homes always go up.  
Brock Hoffman I can't seem to figure out rehab costs
27 July 2017 | 8 replies
I just got estimates for interior paint on a flip (walls AND trim) and the quotes came back $8k-$25k.
Account Closed Would you like some Hills Bros. Coffee with your can light?
2 August 2017 | 3 replies
The drop ceiling would have hidden the coffee can with only the trim piece being visible thus it would have easily passed for a legit fixture at a casual glance.Obviously this would not pass a rough-in electrical inspection for many reasons the main one being that a coffee can is not UL Listed for that particular use so I am not in any way recommending re-creating this no matter how tight your budget is lol.
Steve DellaPelle 20 Days to Closing - To Do List
2 August 2017 | 2 replies
Painting, fix up some trim, replace old appliances, and the biggest thing get the flooring re-done.I am using FHA and I am awaiting the lender's appraisal to receive final approval (although we anticipate everything to pass).I have reached out to some contractors but getting in these units has been difficult since the seller is away and the listing agent seems to be traveling at the moment...
James Allen First Time Atlanta Flipper Needs Advice!!
3 August 2017 | 12 replies
Demo Total Bath and kitchen           Walls and ceilings           Windows, doors and trim         Floors where damaged         Rent dumpsters           Total labor 5580             Exterior Painting           Pressure wash house         Caulk where needed           Paint house           Total labor and estimated materials 4850           Foundation         Reinforce existing footings         Replace floor joists where needed and install new subfloors   Install new floor joists in addition to level with existing house   Total labor and estimated materials 8875           Plumbing           Replace pipes throughout       Run new pipes to accommodate new layout     Replace main water line         Total labor and materials       7500           Insulation             Install insulation in attic         Install insulation on walls       Total labor and materials 4580           Electrical           Update electrical throughout       Total labor and materials 7850           HVAC           Install a new HVAC system       Install new duct work       Total labor and materials       5890                                                                                             Interior work         Total Open up living room to dining room       Create 3 bedrooms and 3 baths         Install sheetrock on walls and ceilings       Mud, sand and prime walls and ceilings     Total labor and estimated materials     12785 Trim work           Install baseboards throughout         Install trim around windows and doors casing   Install new interior doors       Total labor and estimated materials     4850 Interior Painting Paint ceilings           Paint walls           Paint trim             Total labor and estimated materials 3580 Wood Floors Repair wood floors         Install new floors in addition       Sand and stain floors throughout     Total labor and materials       6750 Master Bath Build a concrete pam in shower         Install hardy boards on walls and floor       Install tile on floor and walls throughout       Install sink cabinets, toilet, and faucets       Install light fixtures and accessories, install glass shower door Total labor and estimated materials     7500 Guest bath         Install tub             Install hardy boards on walls and floor       Install tile on floor and walls         Install faucets, sink, and toilet         Install light fixtures and accessories     Total labor and estimated materials     5750                                                                                           Guest bath         Total Install tub             Install hardy boards on walls and floor       Install tile on floor and walls throughout       Install faucets, sink, and toilet         Install light fixtures and accessories     Total labor and estimated materials     5750 Kitchen           Install hardy boards on floor         Install tile on floor           Install cabinets           Install sink and faucet       Install door knobs         Install granite and backsplash       Total labor and estimated materials     7500 Roof Remove old shingles and repair plywood Install new shingles (25 year warranty).
Alex Babayev YOUR OPINION - Are Business Cards still relevant in 2017?
16 March 2019 | 62 replies
The only time I touch tree pieces (outside of trimming my beloved palms) is when I close on a property.
Colin O'Neill Renting property as rooms to university students
11 August 2017 | 9 replies
I pay the annual fee just because it is easier for me but you can sign up for a shorter contract period to trim your expenses.
Peter K. Refinance- how do you make money off that?
18 August 2017 | 28 replies
Couple thoughts: I currently have a budget that is pretty trim.
Brian Pulaski Orange County NY Labor Contractor Recommendations
22 September 2018 | 5 replies
HiDid you find someone I have a house where I need someone to install doors, trimming, sheetrock, tiles, fix deck etc, can you help me with someone for the labor 
Andri Artayudianto Lead paint questions. Philadelphia, PA
17 August 2017 | 7 replies
However, there is usually lead on some of the older trim.