
12 December 2007 | 7 replies
This storm door has taken 3 coats of paint and the $29.00 Plexiglas replacement window that I had cut, its a hair too small causing the rubber molding strips to be too loose.

13 December 2007 | 1 reply
Give me a apt complex of like 75 or a hundred I can go as low as $160 for a FULL SHOWER and tub but only a 1 year warranty and a single THICK coat of acrylic with 2 primer coats.

11 March 2008 | 4 replies
If it is in a valley, hopefully it's just the flashing and will only take a good coat of tar painted in the area.

5 February 2008 | 2 replies
We once remodeled an entire kitchen in my company with our coatings only for like $4000, but I am talking 100% remodel.

23 January 2008 | 6 replies
My background is in construction and decorative concrete coatings.

24 January 2008 | 11 replies
No sugar coating there...

27 February 2008 | 3 replies
If it is the thicker size, I believe around 6" lath and you have a place to save it, do so or advertise it for sale.

27 February 2008 | 3 replies
Then paint the stairs (usually 2 coats) with a Hershey's Milk Chocolate color brown (I had to get the local flavor in there - pun intended).

1 November 2011 | 12 replies
.- New sub floors in Kitchens where needed , and then Linoleum floors in kitchen- Total Cleanout 3-4 Roll Off Dumpsters for left behind junk- Linoleum in pantry 4x8- 2 Bathrooms - Needs new linoleum and 1 needs Sub floor- Bathroom walls - rip off old plastic tile in one and make drywall and paint - Ba 2 Needs Rip off wall paper and skim and paint2 - Living room Kitchen & (2) Dining Room and 3 (6)Bed rooms Refinish Hardwood floors on ea floor so x22- Living rooms, kitchen and dining rooms, remove wall paper and skim coat, and paint all walls and ceilings2 - Living Rooms and windows remove all trim and replace with new and paint ( lead Paint )2 - Repair Bathroom Ceilings and Pantry Ceilings and then paint6 Bedrooms Fix Drywall, paint walls and ceilings2 Bathrooms install bathtub wall panels2 - Install Kitchen Cabinets , and countertops, and Sink in both pantrys2- Install Dishwashers including pipe, drains and elec in two pantries2 - Over stove - More cabinets in Kitchen @ 6 ft top and bottom with countertops2 Install washer and dryer hookups after bringing power to locationApprox 150-200 ft of Asbestos removal in basementalso what is the lead time to do all this..?

25 March 2012 | 10 replies
As I was arriving to the property the crew was leaving except one worker who was staying behind to put the final coat of clear on the floors.