
28 February 2025 | 46 replies
Agents will ask for anything from 2% to 3.5% its up to me to counter..

10 February 2025 | 0 replies
New kitchen, bathroom, counter tops and appliances throughout the home, including new HVAC.

17 February 2025 | 9 replies
The way I countered this (still not as good as buying a note with idle cash but I have checkbook control) is the money paid out from a note fund I invested in is at Axos bank.

13 February 2025 | 5 replies
The sellers countered at 450 and closing costs.

11 March 2025 | 22 replies
Personally as an investor, we have recast our growth goals several times over the years, but ultimately if you invest for your lifestyle you don't need 100s of doors - that is actually counter productive.

8 February 2025 | 15 replies
When I submit the offer I’m thinking of lowballing though to see what their counter would be.

21 February 2025 | 14 replies
, do I accept the counter?

11 February 2025 | 21 replies
Keep offering ever 2-3 weeks until seller counters!

6 February 2025 | 2 replies
Sounds like a good opportunity but I am tied up with my own stuff...Under 100kNeeds: Roof, some plumbing and electric, kitchen cabinets and counters and a vanity He put in a good amount and has a project underway but just wants out.

2 March 2025 | 26 replies
. Move outlet from behind range to more optimal location Install GFCI outlets within 4 feet of each other along counter space.o At Least two dedicated lines – all on GFCI breakers and at least one GFCI outletper circuit Install dedicated electrical circuits as follows:o Microwave: Dedicated 20-amp circuit (12/2 NM wire with a ground).o Garbage disposal: Dedicated 15-amp circuit (14/2 NM cable with a ground).o Refrigerator: Dedicated 20-amp circuit (12/2 NM wire).o Gas range: Dedicated 120-volt, 20-amp circuit (12/2 NM cable).o Dishwasher: Dedicated 15-amp circuit (14/2 NM cable with a ground).Bathroom Demolish existing bathroom elements. Install new cement board on floor and tub surround.o Seal with cement tape and red guard Install new fan, light, mirror, vanity, and replace toilet lid. Remove old tile and install new tile. Install new hardware and replace any old drain and supply lines. Install niche and tile from bathtub to ceiling. Install new bathtub and GFCI outlet. Light and fan on same switch Install all necessary plumbingLiving Room Install sliding door board trim. Install spot lights. Install 3-way switches in the hallway, living area and staircase (where marked). Install new air vent covers.Hallway/Staircase Install 10-inch LED light. 3-way switch (one near kitchen other near bedroom) Place laminate with Metal bullnose Install spotlights over staircase and one at landing at the bottomo lights on 3 way switchesBalcony Paint railing. Replace lightBedrooms Install spotlights in bedroom (up to four per bedroom). Install new fan. Spackle, sand, and paint. Paint closets and shelving, ensuring proper installation of shelves. Install spotlight in walk-in closet.Outside Paint stair railing. Install or repair 2 doorbells. Install or repair 2 exterior lights.Materials Included Cement/hardy board, drywall material. Granite slab for countertop and bar. Kitchen sink (D shape). Setting materials (thinset, grout, drywall tape, red guard, etc.). Baseboards, door, and balcony trim. Plumbing materials (excluding fixtures). Fastener screws.Total labor cost: $13,000